[Halld-tagger] information about tagger racks and cables
Fernando J Barbosa
barbosa at jlab.org
Sat May 11 18:02:49 EDT 2013
Hi Richard,
Tim is best contact regarding the mechanical setup in the tagger hall.
I recall that quite sometime ago we discussed with you the setup to
determine the shortest possible cable lengths (40 ft). The racks are
fixed due to cabling and the power mains (110V and 208V), which are
fixed. The cables will be on trays but I am not sure if they are movable.
Best regards,
Fernando
On 5/10/2013 2:32 PM, Richard Jones wrote:
> Hello Fernando and Tim
>
> During the installation meeting there was a discussion of the signal
> cables from the microscope to the electronic racks in the tagger
> hall. We are now finalizing the layout of the tagger microscope
> readout, and would like to verify that the cable routes and plans for
> cable trays in the tagger hall are compatible with our drawings.
>
> Also, we need to discuss what happens when we need to move the
> microscope from its nominal position at 9GeV on the focal plane to
> 6GeV (for the pion polarizability measurement) and possibly
> elsewhere. Is it planned to make the electronics racks for the
> microscope mobile (eg. on castors) so that they can move along with
> the microscope? Are there plans to have cable trays for these signal
> cables, or do they just lie on the floor? If trays, will the trays be
> movable?
>
> It would be helpful to have a floor plan of the tagger building
> available during our biweekly meeting on Monday, so we can see what
> the limits will be, given the lengths of signal cables that already
> exist. I think these cables have already been made?
>
> -Richard Jones
>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: barbosa.vcf
Type: text/x-vcard
Size: 265 bytes
Desc: not available
Url : https://mailman.jlab.org/pipermail/halld-tagger/attachments/20130511/ecbad96d/attachment.vcf
More information about the Halld-tagger
mailing list