[Halld-tagger] Tagger hall plans

Franz Klein fklein at jlab.org
Thu Aug 21 12:29:28 EDT 2014


For TAGH I would like to finish the cable connections downstream of the microscope and test the whole array using the installed electronics (at least using the CAEN-HV boxes). If possible, I'd like to do it some time next week.

Greetings,
Franz

----- Original Message -----
From: "Richard Jones" <richard.t.jones at uconn.edu>
To: "Alexander Somov" <somov at jlab.org>
Cc: "Hall D beam working group" <halld-tagger at jlab.org>
Sent: Thursday, August 21, 2014 12:19:02 PM
Subject: Re: [Halld-tagger] Tagger hall plans



In his last message, Alex Somov wrote: 


Richard should return the VXS crate, which we can install into the existing rack in the ESB. 



Will do. Can you provide us with enough lemo cables and a splitter to connect 15 outputs at a time to the crate, and read out both the fadc and tdc at the same time? 


-Richard J. 



On Thu, Aug 21, 2014 at 11:08 AM, Alexander Somov < somov at jlab.org > wrote: 



Hi Fernando, 

I tink that testing of TAGM should be done in the ESB. If the 
detector components are here in the beginning of September, 
it would take at least a week or two to assemble the TAGM. We 
may consider to move the detector to the Hall just to check that 
evrt fits and bring it back to the ESB. 

Richard should return the VXS crate, which we can install into 
the existing rack in the ESB. We'll need a control Wiener crate 
and some spare cables to read out one or two fadcs. 

Cheers, 
Alex 








On Thu, 21 Aug 2014, Richard Jones wrote: 



Fernando, 

I am going to propose that we set things up in the ESB area when we arrive, 
and do what setup and testing we can there prior to the move-in date in the 
first week of October or thereabouts. Any objections? 

-Richard Jones 


On Thu, Aug 21, 2014 at 10:03 AM, Fernando J Barbosa < barbosa at jlab.org > 
wrote: 



Hi Richard, Alex, 

We will start removing the electronics from the tagger hall on 22 Sept 
2014 in preparation for beam on 29 Sept 2014. All the cables will be 
disconnected from the modules but remain in place with the mini-racks; we 
then remove the crates/chassis with the modules and move them to a safe 
place, probably the ESB. 

You have indicated that you will be bringing the TAGM to JLab during the 
week of 9/1. In view of this, you only have two weeks (weeks of 9/8 and 
9/15) to install, connect and test the TAGM. Is this enough time to do any 
significant work (setup software, controls, readout, etc)? Or should we 
plan to work in the ESB, which allows limited testing (limited number of 
cables, no 208V for the crates so power is an issue anywhere outside of the 
tagger hall)? 

Please work out a viable plan and let me know ASAP. If we are not going to 
do anything in the tagger hall, we could go ahead and start removing the 
electronics earlier so we are not rushing later. 

Best regards, 
Fernando 




_______________________________________________
Halld-tagger mailing list
Halld-tagger at jlab.org
https://mailman.jlab.org/mailman/listinfo/halld-tagger

-- 
===============================================================
                  Franz J. Klein, Associate Professor 
                  CUA, Department of Physics
                  Washington, DC 20064
  office: Hannan Hall 206          phone: 202-319-6190 
  or: Jefferson Lab,CC F-243       phone: 757-269-6672 
---------------------------------------------------------------



More information about the Halld-tagger mailing list