Folks,

The next FDC group meeting is scheduled for tomorrow afternoon
at 1:30 p.m. in F326. The agenda is given below.


 				Regards,

 					Daniel

**********************************************************************
FDC Weekly Meeting Agenda
July 23, 2009
-----------------------------
1. Full-scale prototype preparations
     - status of ground cable orders; cable preparation
     - update on gas window construction
     - stack construction
        - status of assembly jig
        - assembly document status
        - status of parts 'n pieces
2. Wire frame update
     - soldering repairs on wire frames
        - status
        - wire frame cleaning update
        - HV current problems
     - update of construction document
        - wire electroplating procedures
     - Phase 3 planning
        - dealing with flatness issues
        - design of combs
        - new strongback design
        - other facility modifications
        - final circuit board design
        - time table for construction
3. Cathode frame update
     - Problems with construction
        - update on modifications to two cathode rings
        - fiducial adjustment to eliminate flipped panels
     - cathode construction updates
        - construction of cathode boards
        - construction of sandwiches
        - layout of boards in prototype
        - cathode frame gas sealing
     - cathode flatness measurement status
        - granite table baseline
     - cathode storage
     - rigid-flex assembly component soldering update
     - rigid-flex assembly attachment
        - test soldering
        - schedule for completing work
     - PR for 2-um board material for production
     - cathode construction document status
     - document for QA/soldering/cleaning cathodes
     - document for QA/stuffing/cleaning cathode daughter boards
4. Miscellaneous
     - signal cable update
         - shield/braid questions
     - cooling system test report
     - HV connections to packages
     - sense and field wire test document
        - testing of production wire order
     - remaining FDC system design work
     - FDC construction clean room location update
5. Prototype tests
     - update on cosmic ray stand
     - small-scale prototype resolution study update
     - test plan for full-scale prototype
     - fixture for support/rotation of full-scale prototype
**********************************************************************
**********************************************************************
*                                                                    *
* Dr. Daniel S. Carman                   e-mail : carman at jlab.org    *
* Staff Scientist                        office : (757)-269-5586     *
* Jefferson Laboratory                   web: www.jlab.org/~carman   *
*                                                                    *
**********************************************************************




More information about the Halld-tracking-hw mailing list