FDC Weekly Meeting Agenda
July 30, 2009
-----------------------------
1. Full-scale prototype preparations
- status of ground cable orders; cable preparation
- update on gas window construction
- stack construction
- status of assembly jig
- assembly document status
- status of epoxy order
2. Wire frame update
- soldering repairs on wire frames
- status
- wire frame cleaning update
- HV current problems
- update of construction document
- wire electroplating procedures
- Phase 3 planning
- dealing with flatness issues
- design of combs
- new strongback design
- other facility modifications
- final circuit board design
- time table for construction
3. Cathode frame update
- problems with construction
- update on modifications to two cathode rings
- fiducial adjustment to eliminate flipped panels
- cathode construction updates
- construction of cathode boards
- construction of sandwiches
- layout of boards in prototype
- cathode flatness measurement status
- granite table baseline
- cathode storage
- rigid-flex assembly component soldering update
- rigid-flex assembly attachment
- test soldering
- schedule for completing work
- PR for 2-um board material for production
- cathode construction document status
- document for QA/soldering/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
4. Miscellaneous
- signal cable update
- shield/braid questions
- cooling system test report
- HV connections to packages
- sense and field wire test document
- testing of production wire order
- remaining FDC system design work
- FDC construction clean room location update
5. Prototype tests
- update on cosmic ray stand
- small-scale prototype resolution study update
- test plan for full-scale prototype
- fixture for support/rotation of full-scale prototype
**********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman at jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************
More information about the Halld-tracking-hw
mailing list