[Hps] First draft of Test run NIM paper
Hansson Adrian, Per Ola
phansson at slac.stanford.edu
Tue Dec 3 19:45:49 EST 2013
Dear All,
this is the first circulation of v1.0 draft of the Test run paper aimed to be published in NIM.
Please see this link: https://confluence.slac.stanford.edu/download/attachments/154928386/hps-testrun-nim-v1_0.pdf?version=1&modificationDate=1386117406086&api=v2
Although complete, being the first draft there are a few things that we know will change and below is a list of them.
- Add data rate estimation to SVT DAQ
- Add data flow diagram for SVT DAQ
- Update style of SVT time residual plot.
- Improved ECal calibration (E/p plot will be updated) and updated trigger turn-on for data and simulation
- Update to angular distribution analysis incl. calibration uncertainty
Most of these known changes will have a small impact on the general outline or any conclusion.
Please send me comments, questions and suggested edits before Dec. 20th i.e. before holidays.
Thank you,
Pelle (for the editors).
More information about the Hps
mailing list