[Isotope-prod] Experiment in the injector
Hari Areti
areti at jlab.org
Mon Mar 13 13:20:12 EDT 2017
I am going to ask Ops for time at the injector for irradiating Gallium.
Let is fix a few things and work out the logistics.
Requisites:
Do we have enough target material? (PD, GK)
Do we have BNNT holders? (KJ)
Beam parameters
1. Beam Energy 18.5 MeV
2. Beam current ?
3. Beam time?
Logistics
Test plan ( revive the previous one, if we had one)
Do we have the means to measure energy and beam size? (I will check)
Assuming that VCU collaborators have time, how do we ship the
irradiated sample?
Anything else?
Once our thoughts are organized, should we meet (even on the phone)
for a few minutes to organize the experiment?
Thanks.
-H
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/isotope-prod/attachments/20170313/c024a513/attachment.html>
More information about the Isotope-prod
mailing list