Dear Kevin,

Please add:

Dec.7 all documentation and talks for the ERR posted

Thanks,
Camille
________________________________
From: Isotope-prod <isotope-prod-bounces at jlab.org> on behalf of Kevin Jordan <jordan at jlab.org>
Sent: Friday, December 4, 2020 10:55 AM
To: isotope-prod at jlab.org <isotope-prod at jlab.org>
Subject: [Isotope-prod] Correction

SORRY, I MUST HAVE LOOKED AT THE WRONG CALENDAR!

We will start back up with the update meetings next week. Important dates:

Dec. 2, 2020; Mini review of thermal aspects of the 5kw isotope experiment

Dec. 14, 2020; ERR for the 5kw isotope experiment

Dec. 15, 2021; PSS certification

Jan. 5, 2021; CHL pumps down the south linac & LERF to 2K

Jan. 6, 2021; HCO

Jan. 11, 2021;  5kw isotope experiment begins

Jan 15, 2021;  5kw isotope experiment finishes

Best regards & stay safe!
Kevin

Known problems:

When to move a power supply into the 1X location & certify. Discussion are on going, about moving GTS PS or waiting to get the UITF PS.

What window to use; analysis of the Beryllium says it will not take the 5kw, we are looking at Titanium - it is available in stock at Atlas UHV
https://www.atlasuhv.com/products/aluminum-titanium-flanges/foil-window-flange/

Would ‘like’ to relocate 1X dipole to correct position - if not additional corrector is needed.

Quarter CM (new) solenoid power runs off 277VAC so a neutral need to be added if one does not exist. (minor effort) David G. & crew are looking into it.

And then there is COVID...
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/isotope-prod/attachments/20201204/5ca2b5fb/attachment.html>


More information about the Isotope-prod mailing list