[Pansophy] J1.3-11 L2PRD Document Status - review with SLAC Wed. Nov 18th - planned shipping Friday Nov 20th
E. Anne McEwen
mcewen at jlab.org
Thu Nov 12 08:35:37 EST 2020
Hello all
J1.3-11 has a documents review with SLAC Scheduled for next week, Wed Nov 18th , with planned shipping on Friday November 20th
This is our last Cryomodule to ship to SLAC - so a big milestone for all of us !
As you can see there are documents missing still - so please take a look and make sure that Pansophy and Docushare are up to date for this Cryomodule
If you need any help., please let us know
Thanks Anne
From: Valerie Bookwalter <bookwalt at jlab.org>
Sent: Thursday, November 12, 2020 7:18 AM
To: E. Anne McEwen <mcewen at jlab.org>; Naeem Huque <huque at jlab.org>
Subject: J1.3-11 L2PRD Production CM Document Status
Here is the current document status for J1.3-11
NOTE: It shows 2 NCRs but I can only find 1... need to look at code.
J1.3-11 Documentation Status
12 Nov 2020
[cid:image001.png at 01D6B8C3.FD0735D0]
Missing data:
Same SN for UCM as in J1.3-02?? RFCG-UC-004
Missing Travelers (may be due to SNs not being in ASSY travelers yet)
J1.3-11 ACTS data still missing
DATA not yet available
* Alignment
* RF Frequency
* Notch Location
* BPMs
* Errata sheet
* Radcon
Open Travelers:
FPCWarm
MISSING
FPCWG
MISSING
Tuner Mech TUNMC
MISSING
24<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=L2PRD&area=L2PRD&system=&TRAV_ID=L2PRD-CM-ASSY-SCND&TRAV_REVISION=R7&page=1&maxpage=8&TRAV_SEQ_NUM=24&serialnum=J1.3-11R>
CM-ASSY-SCND
LCLS2 Production Cryomodule Assembly Traveler Cold Mass Phase 2 (WS3)
22<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=L2PRD&area=L2PRD&system=&TRAV_ID=L2PRD-CM-ASSY-VV&TRAV_REVISION=R4&page=1&maxpage=8&TRAV_SEQ_NUM=22&serialnum=>
CM-ASSY-VV
LCLS2 Production Cryomodule Vacuum Vessel Assembly Traveler
28<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=L2PRD&area=L2PRD&system=&TRAV_ID=L2PRD-CM-ASSY-FNAL&TRAV_REVISION=R6&page=1&maxpage=6&TRAV_SEQ_NUM=28&serialnum=J1.3-11R>
CM-ASSY-FNAL
LCLS2 Production Cryomodule Final Assembly Traveler
19<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=L2PRD&area=L2PRD&system=&TRAV_ID=L2PRD-CM-ACTS-PREP&TRAV_REVISION=R1&page=1&maxpage=7&TRAV_SEQ_NUM=19&serialnum=J1.3-11R>
CM-ACTS-PREP
LCLSII (Production Cryomodule) Install and Cool Down
24<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=L2PRD&area=L2PRD&system=&TRAV_ID=L2PRD-CM-ACTS&TRAV_REVISION=R4&page=1&maxpage=29&TRAV_SEQ_NUM=24&serialnum=J1.3-11R>
CM-ACTS
L2PRD-CM-ACTS
24<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=L2PRD&area=L2PRD&system=&TRAV_ID=L2PRD-CM-ASSY-SHIP&TRAV_REVISION=R6&page=1&maxpage=6&TRAV_SEQ_NUM=24&serialnum=J1.3-11R>
CM-ASSY-SHIP
LCLS2 Cryomodule Prep and Shipping to SLAC- WS6
CM-CM-INSP-VV
MISSING
CM-CM-DMAG-VV
MISSING
JTValve6
MISSING
JTValve10
MISSING
IP75SD
MISSING
27
CST-ASSY-LEAK
LCLS-II Cavity string leak test and transfer to phase 1
CAVINSP7
MISSING
CAV-VTA-HOM
FOR CAVITY 0317 IS MISSING
CAV3HP1
CAV6HP2
MISSING
CAV7HP2
MISSING
CAV4HP3
MISSING
FPFTINSP7
LCLS-II Field Probe Feedthru Receiving Inspection
Open NCRs:
SEQ NUM
TRAV
DESCRIBE
DISPOSITION
FINAL DISPOSITION
1960<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=L2PRD&area=L2PRD&system=&TRAV_ID=L2PRD-NCR&TRAV_REVISION=R10&page=1&maxpage=4&TRAV_SEQ_NUM=1960&serialnum=J1.3-11R>
CM-ASSY-FRST
Leak found in cavity 8 helium vessel, S/N 330.
Open D3s:
SEQ NUM
TRAV
DESCRIBE
D3CLASSIFICATION
281<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=L2PRD&area=L2PRD&system=&TRAV_ID=L2PRD-D3&TRAV_REVISION=R1&page=1&maxpage=1&TRAV_SEQ_NUM=281&serialnum=J1.3-11R> [https://pansophy.jlab.org/pansophy/Imagelib/Circle_Red.png]
CM-MAG-QUAD
This D# is in because we just leaked checked the cavity connections that where re-done we did not leak check the whole cavity string again
OTHER
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20201112/6c0161f8/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 6685 bytes
Desc: image001.png
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20201112/6c0161f8/attachment-0002.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 541 bytes
Desc: image002.png
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20201112/6c0161f8/attachment-0003.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 2020Nov12_J1.3-11_CMtraveler.xlsx
Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Size: 376350 bytes
Desc: 2020Nov12_J1.3-11_CMtraveler.xlsx
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20201112/6c0161f8/attachment-0001.xlsx>
More information about the Pansophy
mailing list