Thanks, Valerie. I started a traveler for HE-331 VTA test result in the newly available L2HE-VTA-CAV-VTRF traveler.

Liang
________________________________
From: Valerie Bookwalter <bookwalt at jlab.org>
Sent: Friday, April 30, 2021 11:39 AM
To: Liang Zhao <lzhao at jlab.org>; pansophy <pansophy at jlab.org>
Cc: Peter Owen <powen at jlab.org>; Tiffany Ganey <ganey at jlab.org>; Katherine Wilson <kwilson at jlab.org>; John Hogan <hogan at jlab.org>; E. Anne McEwen <mcewen at jlab.org>; Jacob Harris <jharris at jlab.org>; Kirk Davis <kdavis at jlab.org>; Ashley Anderson Mitchell <ashleya at jlab.org>
Subject: RE: HE VTRF traveler status? (STATUS of L2HE travelers for Cavities) PLEASE REVIEW THE REQUESTS


Liang,



Please do not enter any new data into the L2PRD project area.



Allen is working on getting the L2HE-VTA-CAV-VTRF traveler into the system,

even though Ari has NOT yet approved the document.



We have received the L2HE-VTA-CAV-COOL traveler and it will be processed soon.

We have not received any other documents, but we have received this request from Tiffany and we are working through this list. If you know who the authors are supposed to be, then let them know we are waiting and working on this.



Process Step

L2HE Traveler ID

Based on Traveler

L2HE Traveler Status

Comments

RF Inspection

L2HE-TUNE-CAV-RFIN



Issued

for as-received from vendor; use D3 for refurbishment cavities

CMM

L2HE-INSP-CAV



Issued

for as-received from vendor; use D3 for refurbishment cavities

Dual USC (Liquinox + DI)

L2HE-CHEM-CAV-USC

C100R-CAV-CHEM-USC

Draft needed based on C100R



2-pass HPR

L2HE-CHEM-CAV-HPR

C100R-CAV-CHEM-HPR

Draft needed based on C100R



First Assembly (FP, FPC, HOM)

L2HE-CLNRM-CAV-FRST

L2PRD-CAV-ASSY-FRST

Draft needed based on L2PRD



Second Assy

L2HE-CLNRM-CAV-SCND

L2PRD-CAV-ASSY-SCND

Draft needed based on L2PRD



Transfer to Test Stand

L2HE-CLNRM-CAV-TSTD and L2HE-CLNRM-CAV-TSTD-D5

L2PRD-CAV-TRANS-TSTD and L2PRD-CAV-TRANS-TSTD-D5

Draft needed based on L2PRD



Cooldown to 2K (including sensor install and checkout)

L2HE-VTA-CAV-COOL

L2PRD-CAV-VTA-COOL

Justin has draft; needs to be uploaded to DocuShare

L2PRD parameters need to be updated for L2HE

VTRF

L2HE-VTA-CAV-VTRF

L2PRD-CAV-VTRF

In Approvals

L2PRD parameters need to be updated for L2HE

HOM Survey

L2HE-VTA-CAV-HOM

L2PRD-CAV-VTA-HOM

Draft needed based on L2PRD





From: Pansophy <pansophy-bounces at mailman.jlab.org> On Behalf Of Liang Zhao
Sent: Friday, April 30, 2021 9:00 AM
To: pansophy <pansophy at jlab.org>
Cc: Peter Owen <powen at jlab.org>
Subject: Re: [Pansophy] HE VTRF traveler status?



Oh, and the HOM survey traveler (L2PRD-CAV-VTA-HOM) usually go together with VTRF traveler. So it probably will go the same path with VTRF traveler.



Liang

________________________________

From: Liang Zhao
Sent: Friday, April 30, 2021 8:56 AM
To: pansophy <pansophy at jlab.org<mailto:pansophy at jlab.org>>
Cc: Peter Owen <powen at jlab.org<mailto:powen at jlab.org>>
Subject: HE VTRF traveler status?



Hi Pansophy team,



I heard from Ari that the HE cavity vertical testing (VTRF) traveler will be copied from L2PRD (L2PRD-CAV-VTRF)? Is that the plan? I have a HE cavity testing result to put in Pansophy. If HE traveler is not going to be ready for a while, I may just put it in L2PRD for now.



Thanks,

Liang
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20210430/57b3e7c1/attachment-0001.html>


More information about the Pansophy mailing list