Pansophy Team,
I have the following updates for the WMGRDR Master list. I don't know the history / status of all the documents listed in the current Master list but I am trying to get the travelers and procedures for at least the chemistry and cleanroom work updated for the girder work scheduled in the upcoming weeks.
WMGRDR-CHEM-COMP-DEGR
- Revision 2 is in the Approvals folder. It is "stuck" in Approvals due to there being an out of date hyperlink in the references. Ashley and I would like to remove that reference for R2 so that the traveler can move forward and be in place soon. Please let me know if I need to resubmit the traveler for approval or if you can delete the reference and complete the routing for approval.
WMGRDR-PR-CLNRM-GRDR-ASSY
- Revision 1 is in the Ready for Approvals folder and is ready to be routed for approval. This document is not listed in the Master List currently.
WMGRDR-GRDR-RMV
- Currently Revision 1 is in Pansophy. I will be submitting a R2 for approval once the WMGRDR-PR-CLNRM-GRDR-ASSY procedure is issued.
- This traveler includes instructions on all aspects of the girder work, so I believe that "Girder Removal" (row 21), "Girder Disa" (row 22), "Girder assembly and leak check" (row 59), and "Installation in Tunnel" (row 66) can be deleted since all of those activities are in the WMGRDR-GRDR-RMV traveler.
- There is not a traveler on the Master list with exactly this ID, so it may need to be added or Row 21 (the closes ID match) needs to be updated.
Tiffany Ganey
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20220201/b8b29fdc/attachment.html>
More information about the Pansophy
mailing list