[Pansophy] ER5C Flanged Bellows Assembly Testing

Gary Cheng cheng at jlab.org
Tue Aug 29 11:19:14 EDT 2023


Looks good to me. Thanks. --- Gary

On 8/29/2023 9:39 AM, Tiffany Ganey wrote:
>
> Thanks for the comments.  Below is the updated traveler body with 
> comments incorporated.
>
> Step No.
>
> 	
>
> Instructions
>
> 	
>
> Data Input
>
> 	
>
> *General handling guidelines:*The bellows are fragile and susceptible 
> to denting if dropped or struck. Great care shall be taken to prevent 
> damage during handling. Both end flanges contain sealing surfaces. 
> Care shall be taken to avoid scratching/gouging these surfaces and 
> protective covers shall be installed over these surfaces at all 
> possible times.
>
> 1
>
> 	
>
> Record the Flanged Bellows Assembly Serial Number.
>
> 	
>
> [[FBASN]] <<FBASN>>
>
> 2
>
> 	
>
> Perform a 3x cold shock of the FBA in LN2.  The part must be submersed 
> in LN2 until visible boiling stops.  The part must be warmed up to 
> room temperature between cool downs.
>
> 	
>
> [[ColdShockTech]] <<SRF>>
>
> [[ColdShockTime]] <<TIMESTAMP>>
>
> Was the part cold shocked 3 times?
>
> [[ColdShockComplete]] <<YESNO>>
>
> [[ColdShockComment]] <<COMMENT>>
>
> 3
>
> 	
>
> Perform a liquid penetrant test on the welds of the FBA. Record test 
> results and/or images.  If the FBA fails the liquid penetrant test, 
> generate an NCR.
>
> 	
>
> [[LPTestTech]] <<SRF>>
>
> [[LPTestTime]] <<TIMESTAMP>>
>
> [[LPTestRecords]] <<FILEUPLOAD>>
>
> [[LPTestImages]] <<FILEUPLOAD>>
>
> Did the part pass the LP Test?
>
> [[LPTestPass]] <<YESNO>>
>
> [[LPTestComment]] <<COMMENT>>
>
> 4
>
> 	
>
> All liquid penetrant testing fluid shall be removed from the FBA after 
> the test.  The FBA may be sent to chemistry for cleaning if necessary.
>
> 	
>
> [[FBACleaned]] <<YESNO>>
>
> [[FBACleanedTime]] <<TIMESTAMP>>
>
> [[FBACleanedComment]] <<COMMENT>>
>
> 5
>
> 	
>
> If the FBA passed the liquid penetrant test, perform a material 
> confirmation of the FBA.  All pieces of the FBA should be 316.  Record 
> test results.  Generate an NCR if the material on any part of the FBA 
> is not 316.
>
> 	
>
> [[MCTestTech]] <<SRF>>
>
> [[MCTestTime]] <<TIMESTAMP>>
>
> [[MCTestRecords]] <<FILEUPLOAD>>
>
> Are all pieces of the part 316?
>
> [[MCTestPass]] <<YESNO>>
>
> [[MCTestComment]] <<COMMENT>>
>
> 6
>
> 	
>
> If the FBA passed the liquid penetrant test and material confirmation, 
> the FBA shall be leak checked in accordance with the 
> ER5C-CMA-COMP-LEAK traveler and then returned to inventory until 
> needed for assembly.
>
> 	
>
> Tiffany Ganey
>
> *From:*Gary Cheng <cheng at jlab.org>
> *Sent:* Monday, August 28, 2023 4:41 PM
> *To:* Jenord Alston <jalston at jlab.org>; Tiffany Ganey 
> <ganey at jlab.org>; Phillip Dobrenz <dobrenz at jlab.org>
> *Cc:* pansophy <pansophy at jlab.org>; Marcus Anthony <manthony at jlab.org>
> *Subject:* Re: ER5C Flanged Bellows Assembly Testing
>
> Tiffany,
>
> A few comments:
> 1. You may want to add a statement on generating a NCR to Step 3 since 
> if a FBA fails LPT, we would not want to use it, hence there is no 
> need to execute subsequent steps.
> 2. Step 4 would also need a statement on generating NCR since even if 
> the material is not 316, e.g. some bellows vendors use 321 stainless 
> steel, we might still use the bellows.
> 3. Is cleaning of FBA going to be done after final leak check? Maybe 
> that shall be in the end dish assembly traveler
> 4. Maybe add a step 5 to this traveler to transition to final leak 
> check after steps 1-4 are all done with no issues.
>
> Thanks,
> Gary
>
> On 8/28/2023 3:38 PM, Jenord Alston wrote:
>
>     Will do, thanks!
>
>     https://www.jlab.org/div_dept/dir_off/public_affairs/logo/JLabEmailSig.png
>
>     Jenord Alston
>
>     JLab Welding Program Manager
>
>     jalston at jlab.org
>
>     757-269-5859 - Office
>
>     *API 570  - Piping Inspector
>
>     *API 510  - Vessel Inspector
>
>     *AWS Certified Welding Inspector (CWI)
>
>     *AWS Certified Welding Educator (CWE)
>
>     *CWI Endorsements:
>
>     *ASME B31.1, B31.3 & Sec. IX
>
>     *ASME Sec. VIII & Sec. IX
>
>     *AWS D17.1 & API 1104
>
>     *ASNT ACCP Level-II VT (GI & PE)
>
>     ------------------------------------------------------------------------
>
>     *From:*Tiffany Ganey <ganey at jlab.org> <mailto:ganey at jlab.org>
>     *Sent:* Monday, August 28, 2023 3:38 PM
>     *To:* Jenord Alston <jalston at jlab.org> <mailto:jalston at jlab.org>;
>     Gary Cheng <cheng at jlab.org> <mailto:cheng at jlab.org>; Phillip
>     Dobrenz <dobrenz at jlab.org> <mailto:dobrenz at jlab.org>
>     *Cc:* pansophy <pansophy at jlab.org> <mailto:pansophy at jlab.org>;
>     Marcus Anthony <manthony at jlab.org> <mailto:manthony at jlab.org>
>     *Subject:* RE: ER5C Flanged Bellows Assembly Testing
>
>     Thanks Jenord.  Marcus should have the ability to record data in
>     the traveler and should be in the drop down menu for the
>     LPTestTech field.  If any issues are encountered when filling in
>     the traveler, please let me know and I’ll work with the Pansophy
>     team to get it corrected.
>
>     Tiffany Ganey
>
>     *From:*Jenord Alston <jalston at jlab.org> <mailto:jalston at jlab.org>
>     *Sent:* Monday, August 28, 2023 3:27 PM
>     *To:* Tiffany Ganey <ganey at jlab.org> <mailto:ganey at jlab.org>; Gary
>     Cheng <cheng at jlab.org> <mailto:cheng at jlab.org>; Phillip Dobrenz
>     <dobrenz at jlab.org> <mailto:dobrenz at jlab.org>
>     *Cc:* pansophy <pansophy at jlab.org> <mailto:pansophy at jlab.org>;
>     Marcus Anthony <manthony at jlab.org> <mailto:manthony at jlab.org>
>     *Subject:* Re: ER5C Flanged Bellows Assembly Testing
>
>     I have no concerns with the traveler as it is. I have copied
>     Marcus Anthony on this email. He will be involved with the welding
>     related QA/QC portions of this project as well. Please provide him
>     with the permissions needed to populate the traveler and copy him
>     on these emails going forward.
>
>     Thanks.
>
>     https://www.jlab.org/div_dept/dir_off/public_affairs/logo/JLabEmailSig.png
>
>     Jenord Alston
>
>     JLab Welding Program Manager
>
>     jalston at jlab.org
>
>     757-269-5859 - Office
>
>     *API 570  - Piping Inspector
>
>     *API 510  - Vessel Inspector
>
>     *AWS Certified Welding Inspector (CWI)
>
>     *AWS Certified Welding Educator (CWE)
>
>     *CWI Endorsements:
>
>     *ASME B31.1, B31.3 & Sec. IX
>
>     *ASME Sec. VIII & Sec. IX
>
>     *AWS D17.1 & API 1104
>
>     *ASNT ACCP Level-II VT (GI & PE)
>
>     ------------------------------------------------------------------------
>
>     *From:*Tiffany Ganey <ganey at jlab.org>
>     *Sent:* Monday, August 28, 2023 3:18 PM
>     *To:* Gary Cheng <cheng at jlab.org>; Phillip Dobrenz
>     <dobrenz at jlab.org>; Jenord Alston <jalston at jlab.org>
>     *Cc:* pansophy <pansophy at jlab.org>
>     *Subject:* ER5C Flanged Bellows Assembly Testing
>
>     Hi All,
>
>     Below is a screen shot of a draft traveler for the Flanged Bellows
>     Assembly (11151-0216, FBA) testing we discussed today.  I have put
>     the cold shock, liquid penetrant testing, and material
>     certification on the one traveler. There is already a traveler in
>     place that we can use for the leak check (ER5C-CMA-COMP-LEAK)
>     after the liquid penetrant testing.  Please let me know if you
>     have any comments or concerns with the draft below. I would like
>     to get this traveler out for approval as soon as possible so that
>     I can get the bellows to Fischer to start the cold shocks.
>
>     Traveler Title
>
>     	
>
>     ER5C Flanged Bellows Assembly (FBA) Cold Shock and Liquid
>     Penetrant Testing
>
>     Traveler Abstract
>
>     	
>
>     This traveler documents testing performed to qualify FBAs for use
>     in an End Dish Assembly
>
>     Traveler ID
>
>     	
>
>     ER5C-CMA-FBA-INSP
>
>     Traveler Revision
>
>     	
>
>     R1
>
>     Traveler Author
>
>     	
>
>     T. Ganey
>
>     Traveler Date
>
>     	
>
>     28-Aug-23
>
>     NCR Informative Emails
>
>     	
>
>     dobrenz
>
>     NCR Dispositioners
>
>     	
>
>     ganey,cheng,weaksmc
>
>     D3 Emails
>
>     	
>
>     dobrenz,ganey,cheng
>
>     Approval Names
>
>     	
>
>     T. Ganey
>
>     	
>
>     G. Cheng
>
>     	
>
>     J. Fischer
>
>     	
>
>     T. Reilly
>
>     Approval Signatures
>
>     	
>
>     	
>
>     	
>
>     	
>
>     Approval Dates
>
>     	
>
>     	
>
>     	
>
>     	
>
>     Approval Title
>
>     	
>
>     Author
>
>     	
>
>     Reviewer
>
>     	
>
>     Work Center Lead
>
>     	
>
>     Project Manager
>
>     References
>
>     	
>
>     List and Hyperlink all documents related to this traveler. This
>     includes, but is not limited to: safety (THAs, SOPs, etc),
>     drawings, procedures, and facility related documents.
>
>     11151-0216
>     <https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-272328/11151-0216_Flanged%20Bellows.pdf>
>
>     Flanged Bellows Assembly
>
>     	
>
>     11151-0215
>     <https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-272330/11151-0215%20CavityBellowsFlange.pdf>
>
>     Cavity Bellows Flange
>
>     	
>
>     11151-0214
>     <https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-272332/11151-0214%20CavityBellows.pdf>
>
>     Cavity Bellows
>
>     	
>
>     11151-0213
>     <https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-272331/11151-0213%20CavityBellowsCuff.pdf>
>
>     Cavity Bellows Cuff
>
>     	
>
>     11151-0216
>     <https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-272328/11151-0216_Flanged%20Bellows.pdf>
>
>     Flanged Bellows Assembly
>
>     	
>
>     	
>
>     	
>
>     	
>
>     Revision Note
>
>     	
>
>     R1
>
>     	
>
>     Initial release of this Traveler.
>
>
>     Step No.
>
>     	
>
>     Instructions
>
>     	
>
>     Data Input
>
>     	
>
>     *General handling guidelines:* The bellows are fragile and
>     susceptible to denting if dropped or struck. Great care shall be
>     taken to prevent damage during handling. Both end flanges contain
>     sealing surfaces. Care shall be taken to avoid scratching/gouging
>     these surfaces and protective covers shall be installed over these
>     surfaces at all possible times.
>
>     1
>
>     	
>
>     Record the Flanged Bellows Assembly Serial Number.
>
>     	
>
>     [[FBASN]] <<FBASN>>
>
>     2
>
>     	
>
>     Perform a 3x cold shock of the FBA in LN2.  The part must be
>     submersed in LN2 until visible boiling stops.  The part must be
>     warmed up to room temperature between cool downs.
>
>     	
>
>     [[ColdShockTech]] <<SRF>>
>
>     [[ColdShockTime]] <<TIMESTAMP>>
>
>     Was the part cold shocked 3 times?
>
>     [[ColdShockComplete]] <<YESNO>>
>
>     [[ColdShockComment]] <<COMMENT>>
>
>     3
>
>     	
>
>     Perform a liquid penetrant test on the welds of the FBA. Record
>     test results and/or images.
>
>     	
>
>     [[LPTestTech]] <<SRF>>
>
>     [[LPTestTime]] <<TIMESTAMP>>
>
>     [[LPTestRecords]] <<FILEUPLOAD>>
>
>     [[LPTestImages]] <<FILEUPLOAD>>
>
>     Did the part pass the LP Test?
>
>     [[LPTestPass]] <<YESNO>>
>
>     [[LPTestComment]] <<COMMENT>>
>
>     4
>
>     	
>
>     Perform a material confirmation of the FBA.  All pieces of the FBA
>     should be 316.  Record test results.
>
>     	
>
>     [[MCTestTech]] <<SRF>>
>
>     [[MCTestTime]] <<TIMESTAMP>>
>
>     [[MCTestRecords]] <<FILEUPLOAD>>
>
>     Are all pieces of the part 316?
>
>     [[MCTestPass]] <<YESNO>>
>
>     [[MCTestComment]] <<COMMENT>>
>
>     Tiffany Ganey
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20230829/76e90191/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 3889 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20230829/76e90191/attachment-0001.png>


More information about the Pansophy mailing list