Hearing no objections so far, I have put 4 procedures in the Ready for Approvals folder.
Allen, Please route these for approval.
- PLACLN-PR-CAV-CCAL: Plasma Processing Cable Calibrations
- PLACLN-PR-NA-CAL: Calibrating the Network Analyzer
- PLACLN-PR-CART-TANK: Replacing a Tank in the Gas Cart
- PLACLN-PR-CM-MNFLD: Plasma Processing Cart Manifolds
The WCD Register status has been updated accordingly. I will work on final checks of the other procedures I proposed are ready for approval as-is and will update you when they have been uploaded to the Ready for Approvals folder.
Tiffany Ganey
From: Tiffany Ganey
Sent: Thursday, March 23, 2023 8:26 AM
To: Tom Powers <powers at jlab.org>; Allen Samuels <samuels at jlab.org>
Cc: pansophy <pansophy at jlab.org>; Tony Reilly <areilly at jlab.org>
Subject: RE: PLACLN Project
The table below is the list of documents for plasma processing during SAD23. I have added a Proposed Path Forward column based on the justification in the Risk, Readiness, and Risk/Readiness Justification columns. Given the first-time nature of plasma processing in CEBAF, there will likely be revisions after the SAD to several of these documents to incorporate lessons learned. However, several are routine enough, are low risk, and/or are in the best state that I can make at this time.
Based on this, I propose that one of the procedures (PLACLN-PR-CAV-PHASE) and the checklist (PLACLN-FM-CM-LIST) be fully reviewed, commented on, and corrected as needed at this time. The remainder of the procedures I propose can be routed for signature as-is (except for PLACLN-PR-CAV-MODE), with the understanding that notes will be taken during the work in CEBAF and revisions will be made prior to the next SAD. The only traveler for this project has already been approved.
If there are any objections or suggestions to this proposal, please let me know today. If any other reviewers are needed to these documents, please also let me know today so that I can add them to the document prior to it being routed for signature.
Proposed Path Forward
Document Title
Document Type
Document ID
Author / Owner
Reviewer 1 (SRFOPS SME or WCL)
Reviewer 2 (SRFOPS WCL or Group Lead)
Principal Investigator
Risk
Readiness
Risk / Readiness Justification
Saved to Ready for Approval Folder
Send for approval as-is
Plasma Processing Cable Calibrations
Procedure
PLACLN-PR-CAV-CCAL
T. Ganey
T. Powers
Low
High
Procedure performed routinely by trained plasma processing staff; software provides real-time data to check correct cable calibrations values are being recorded
Hold
Create HOM Modes File for Plasma Processing
Procedure
PLACLN-PR-CAV-MODE
T. Ganey
T. Powers
Medium
Medium
May not be needed for cryomodule work due to phase shifter calculations. Only performed by trained plasma processing staff.
Tom re-writes or provides corrections
Phase Shift for Plasma Processing C100 Cavities
Procedure
PLACLN-PR-CAV-PHASE
T. Ganey
T. Powers
Medium
Low
Procedure needs technical information / graphs from Tom. Only Tom (with me helping) will be performing this task.
Saved to Ready for Approval Folder
Send for approval as-is
Calibrating the Network Analyzer
Procedure
PLACLN-PR-NA-CAL
T. Ganey
T. Powers
Low
High
Procedure performed routinely by trained plasma processing staff; process not unique to plasma processing - staff trained to use a network analyzer should be able to perform the calibration with minimal procedural reference
Saved to Ready for Approval Folder
Send for approval as-is
Replacing a Tank in the Gas Cart
Procedure
PLACLN-PR-CART-TANK
T. Ganey
T. Powers
Medium
High
Procedure written to ensure task is performed safely - not a technical nor detailed procedure
Tom and Mike review and comment prior to approval cycle
Cryomodule Plasma Processing Checklists
Form
PLACLN-FM-CM-LIST
T. Ganey
M. Drury
T. Powers
High
Medium
Checklist will be followed by plasma processing and beamline vacuum staff; must be as accurate as possible to ensure coordination; lessons learned during SAD23 may lead to a post-SAD revision
Saved to Ready for Approval Folder
Send for approval as-is
Plasma Processing Cart Manifolds
Procedure
PLACLN-PR-CM-MNFLD
T. Ganey
A. Mitchell
C. Dreyfuss
T. Powers
Low
High
Exact configuration of manifolds to be determined and will be provided in a separate document; procedure to be performed by trained chemistry and cleanroom staff in accordance with standard practices
Send for approval as-is
Connect Cryomodule to Plasma Carts
Procedure
PLACLN-PR-CM-CONN
T. Ganey
M. Drury
T. Powers
High
Medium
Beamline vacuum work is of high risk due to nature of introducing particulate to the cryomodule; first-time work to install plasma carts to cryomodule in CEBAF; procedure based on cryomodule plasma processing in CMTF; procedure to be performed by trained beamline vacuum technicians with oversight from plasma processing staff; multiple meetings have been held to discuss details between plasma processing and beamline vacuum technicians.
Send for approval as-is
Prepare for Cryomodule Plasma Processing
Procedure
PLACLN-PR-CM-PREP
T. Ganey
T. Powers
Medium
High
Procedure performed routinely by trained plasma processing staff; Only Tom and/or myself will be responsible for executing the plasma processing preparation (with help as available)
Send for approval as-is
Cryomodule Plasma Processing
Procedure
PLACLN-PR-CM-PROC
T. Ganey
T. Powers
Medium
High
Procedure performed routinely by trained plasma processing staff; Tom and/or myself will be on-site for all plasma processing and overseeing any other staff assisting; software interlocks protect the cryomodule when correctly applied
Send for approval as-is
Disconnect Cryomodule from Plasma Carts
Procedure
PLACLN-PR-CM-DISC
T. Ganey
M. Drury
T. Powers
High
Medium
Beamline vacuum work is of high risk due to nature of introducing particulate to the cryomodule; first-time work to install plasma carts to cryomodule in CEBAF; procedure based on cryomodule plasma processing in CMTF; procedure to be performed by trained beamline vacuum technicians with oversight from plasma processing staff; multiple meetings have been held to discuss details between plasma processing and beamline vacuum technicians.
Complete conversion and begin entering data
C100 Cryomodule Plasma Processing
Traveler
PLACLN-CMTF-CM-PLSM
T. Ganey
M. Drury
T. Powers
Low
High
Traveler has been approved and is ready to be converted into Pansophy
Tiffany Ganey
From: Tom Powers <powers at jlab.org<mailto:powers at jlab.org>>
Sent: Wednesday, March 22, 2023 10:24 AM
To: Allen Samuels <samuels at jlab.org<mailto:samuels at jlab.org>>; Tiffany Ganey <ganey at jlab.org<mailto:ganey at jlab.org>>
Cc: pansophy <pansophy at jlab.org<mailto:pansophy at jlab.org>>; Tony Reilly <areilly at jlab.org<mailto:areilly at jlab.org>>
Subject: Re: PLACLN Project
Some of the detailed procedures need work, mostly it is on me. It is mostly documenting things that Tiffany and I do every day.
They are all in docushare at the following location
https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-51333
The traveler is ready to go.
T
On 3/22/2023 9:09 AM, Allen Samuels wrote:
Tiffany and Tom,
I was wondering if you could give a status update on the PLACLN project. Are the travelers and procedures ready for use, or is there still work to be done? With the SAD already started, we want to be son the same page as you for the project’s readiness.
Allen
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20230323/0248fe62/attachment-0001.html>
More information about the Pansophy
mailing list