[Pansophy] FW: Final Disposition: NCR:623 on SNSPPU-CMA-SEC-INSP-R3--9

Gary Cheng cheng at jlab.org
Fri Mar 31 10:37:35 EDT 2023


Valerie,

NCR 623 is still closed. I sent a request to pansophy already. How may I 
submit a service request?

Thanks,
Gary

On 3/31/2023 10:25 AM, Valerie Bookwalter wrote:
>
> Gary,
>
> Did you get this resolved?
>
> If not, please put in a Service Request in Pansophy.
>
> Thanks
>
> Valerie
>
> *From:* Pansophy <pansophy-bounces at mailman.jlab.org> *On Behalf Of 
> *Gary Cheng via Pansophy
> *Sent:* Tuesday, March 28, 2023 3:47 PM
> *To:* pansophy <pansophy at jlab.org>
> *Cc:* SRFINV at JLAB.ORG; Ed Daly <edaly at jlab.org>; John Fischer 
> <fischer at jlab.org>; Tony Reilly <areilly at jlab.org>
> *Subject:* Re: [Pansophy] Final Disposition: NCR:623 on 
> SNSPPU-CMA-SEC-INSP-R3--9
>
> Sorry, I closed the wrong NCR. Please re-open this one.
>
> Gary
>
> On 3/28/2023 3:41 PM, CHENG at JLAB.ORG <mailto:CHENG at JLAB.ORG> wrote:
>
>     An Engineer has responded to the reworked/remeasured
>     Non-Conformance Report - sequence number 623 for traveler
>     SNSPPU-CMA-SEC-INSP-R3--9.
>
>     *THIS NCR HAS BEEN AUTOMATICALLY CLOSED BASED ON DISPOSITION*
>
>     *PAGE 4: FINAL DISPOSITION*
>
>     Response Engr:
>
>     	
>
>     CHENG
>
>     Response Date:
>
>     	
>
>     28-Mar-2023
>
>     Disposition:
>
>     	
>
>     Conforming
>
>     Disposition Comment:
>
>     	
>
>     Communicated with CMA group lead, the missing shields have been found
>
>     *PAGE 3: MODIFICATION/RE-MEASURE*
>
>     Rework Staff:
>
>     	
>
>
>
>
>
>     Rework Date:
>
>     	
>
>
>
>
>
>     Rework Comment:
>
>     	
>
>
>
>
>
>     Verify Staff:
>
>     	
>
>
>
>
>
>     Verify Date:
>
>     	
>
>
>
>
>
>     Verify Comment:
>
>     	
>
>
>
>
>
>     *ENGINEER RESPONSE*
>
>     Response Engr:
>
>     	
>
>
>
>
>
>     Response Date:
>
>     	
>
>
>
>
>
>     Disposition:
>
>     	
>
>     Hold/Re-measure
>
>     Disposition Comment:
>
>     	
>
>
>
>
>
>     *PAGE 2: FIRST DISPOSITION*
>
>     Response Engr:
>
>     	
>
>     CHENG
>
>     Response Date:
>
>     	
>
>     11-Nov-2022
>
>     Disposition:
>
>     	
>
>     Hold/Re-measure
>
>     Disposition Comment:
>
>     	
>
>     At this stage, it's not sure if rectification is needed
>     immediately. The plan is to try and install SEC 06 onto CM07,
>     loosen the hardware at both ends of the elbow/bellows and see how
>     well it corrects. There is a possibility that the elbow needs to
>     be cut open and rotated, if determined necessary
>
>     *PAGE 1: INITIATE AND DESCRIBE*
>
>     SN:
>
>     	
>
>     006
>
>     SNtype:
>
>     	
>
>     SECSN
>
>     DRAWING NUM:
>
>     	
>
>     104210600-M8U-8200-A001
>
>     PART DESCRIPTION:
>
>     	
>
>     SUPPLY END CAN ASSY
>
>     TRAV_ID:
>
>     	
>
>     SNSPPU-CMA-SEC-INSP
>
>     TRAV_REV:
>
>     	
>
>     R3
>
>     TRAV_SEQ_NUM:
>
>     	
>
>     9
>
>     DESCRIBE STAFF:
>
>     	
>
>     CHENG
>
>     DESCRIBE DATE:
>
>     	
>
>     2022-11-11 08:21:00.0
>
>     DESCRIBE COMMENT:
>
>     	
>
>     Refer to the phase 1 and phase 2 measurements. There are multiple
>     nonconformances, like seen on other SEC's. The most worrisome
>     deviation is on the bridge tube angle, i.e. 4.8 degree
>     out-of-tolerance, 5.3 degrees total deviation.
>
>     NOTIFICATION COMMENT:
>
>     	
>
>     The NCR is at the following URL: 623
>     <https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=SNSPPU&area=SNSPPU&system=CMA&TRAV_ID=SNSPPU-NCR&TRAV_REVISION=R12&page=4&maxpage=4&TRAV_SEQ_NUM=623&travstat=y&serialnum=006&SN=006&SNTYPE=SECSN>
>
>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20230331/31bf8a94/attachment.html>


More information about the Pansophy mailing list