[Pansophy] FW: Final Disposition: NCR:623 on SNSPPU-CMA-SEC-INSP-R3--9
Gary Cheng
cheng at jlab.org
Fri Mar 31 10:37:35 EDT 2023
Valerie,
NCR 623 is still closed. I sent a request to pansophy already. How may I
submit a service request?
Thanks,
Gary
On 3/31/2023 10:25 AM, Valerie Bookwalter wrote:
>
> Gary,
>
> Did you get this resolved?
>
> If not, please put in a Service Request in Pansophy.
>
> Thanks
>
> Valerie
>
> *From:* Pansophy <pansophy-bounces at mailman.jlab.org> *On Behalf Of
> *Gary Cheng via Pansophy
> *Sent:* Tuesday, March 28, 2023 3:47 PM
> *To:* pansophy <pansophy at jlab.org>
> *Cc:* SRFINV at JLAB.ORG; Ed Daly <edaly at jlab.org>; John Fischer
> <fischer at jlab.org>; Tony Reilly <areilly at jlab.org>
> *Subject:* Re: [Pansophy] Final Disposition: NCR:623 on
> SNSPPU-CMA-SEC-INSP-R3--9
>
> Sorry, I closed the wrong NCR. Please re-open this one.
>
> Gary
>
> On 3/28/2023 3:41 PM, CHENG at JLAB.ORG <mailto:CHENG at JLAB.ORG> wrote:
>
> An Engineer has responded to the reworked/remeasured
> Non-Conformance Report - sequence number 623 for traveler
> SNSPPU-CMA-SEC-INSP-R3--9.
>
> *THIS NCR HAS BEEN AUTOMATICALLY CLOSED BASED ON DISPOSITION*
>
> *PAGE 4: FINAL DISPOSITION*
>
> Response Engr:
>
>
>
> CHENG
>
> Response Date:
>
>
>
> 28-Mar-2023
>
> Disposition:
>
>
>
> Conforming
>
> Disposition Comment:
>
>
>
> Communicated with CMA group lead, the missing shields have been found
>
> *PAGE 3: MODIFICATION/RE-MEASURE*
>
> Rework Staff:
>
>
>
>
>
>
>
> Rework Date:
>
>
>
>
>
>
>
> Rework Comment:
>
>
>
>
>
>
>
> Verify Staff:
>
>
>
>
>
>
>
> Verify Date:
>
>
>
>
>
>
>
> Verify Comment:
>
>
>
>
>
>
>
> *ENGINEER RESPONSE*
>
> Response Engr:
>
>
>
>
>
>
>
> Response Date:
>
>
>
>
>
>
>
> Disposition:
>
>
>
> Hold/Re-measure
>
> Disposition Comment:
>
>
>
>
>
>
>
> *PAGE 2: FIRST DISPOSITION*
>
> Response Engr:
>
>
>
> CHENG
>
> Response Date:
>
>
>
> 11-Nov-2022
>
> Disposition:
>
>
>
> Hold/Re-measure
>
> Disposition Comment:
>
>
>
> At this stage, it's not sure if rectification is needed
> immediately. The plan is to try and install SEC 06 onto CM07,
> loosen the hardware at both ends of the elbow/bellows and see how
> well it corrects. There is a possibility that the elbow needs to
> be cut open and rotated, if determined necessary
>
> *PAGE 1: INITIATE AND DESCRIBE*
>
> SN:
>
>
>
> 006
>
> SNtype:
>
>
>
> SECSN
>
> DRAWING NUM:
>
>
>
> 104210600-M8U-8200-A001
>
> PART DESCRIPTION:
>
>
>
> SUPPLY END CAN ASSY
>
> TRAV_ID:
>
>
>
> SNSPPU-CMA-SEC-INSP
>
> TRAV_REV:
>
>
>
> R3
>
> TRAV_SEQ_NUM:
>
>
>
> 9
>
> DESCRIBE STAFF:
>
>
>
> CHENG
>
> DESCRIBE DATE:
>
>
>
> 2022-11-11 08:21:00.0
>
> DESCRIBE COMMENT:
>
>
>
> Refer to the phase 1 and phase 2 measurements. There are multiple
> nonconformances, like seen on other SEC's. The most worrisome
> deviation is on the bridge tube angle, i.e. 4.8 degree
> out-of-tolerance, 5.3 degrees total deviation.
>
> NOTIFICATION COMMENT:
>
>
>
> The NCR is at the following URL: 623
> <https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=SNSPPU&area=SNSPPU&system=CMA&TRAV_ID=SNSPPU-NCR&TRAV_REVISION=R12&page=4&maxpage=4&TRAV_SEQ_NUM=623&travstat=y&serialnum=006&SN=006&SNTYPE=SECSN>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20230331/31bf8a94/attachment.html>
More information about the Pansophy
mailing list