[Pansophy] SNSPPU-CMA-CMASS-ASSY-R3 References

Allen Samuels samuels at jlab.org
Tue Oct 10 11:04:41 EDT 2023


Gary,

It's been a while on this traveler, have you had a chance to look at these references?

From: Pansophy <pansophy-bounces at mailman.jlab.org> On Behalf Of Allen Samuels via Pansophy
Sent: Monday, September 18, 2023 1:43 PM
To: Gary Cheng <cheng at jlab.org>
Cc: SRF Pansophy (pansophy at jlab.org) <pansophy at jlab.org>
Subject: [Pansophy] SNSPPU-CMA-CMASS-ASSY-R3 References

Gary,

I was looking over your SNSPPU-CMA-CMASS-ASSY traveler before routing. Part of that involved updating the drawing links to ones to the jlab document control group area, which is the preferred method for drawings now. I also looked at the procedure links, and had some things I wanted to bring up. The CP-SNSPPU-CM-INST-MLI procedure goes to a C75 procedure, and does not appear to have been approved. The Indium Installation Procedure didn't have any project assigned to it, but I did find this version<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-257359/SRF-MSPR-CMA-THERM-IND-R1.pdf> in the SRF Master Procedure area, and wanted to be sure it was acceptable before I changed it. Could you confirm if the linked Indium procedure version is acceptable, and let me know if there is an acceptable alternative to the CP-SNSPPU-CM-INST-MLI procedure? If it is something that will be used in multiple projects, it could be turned into a master procedure.

Allen

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20231010/667f6678/attachment.html>


More information about the Pansophy mailing list