[Pansophy] Travelers to be moved from STP area to the new SRFRD area for SRF S&T use
Valerie Bookwalter
bookwalt at jlab.org
Sat Apr 26 17:42:20 EDT 2025
GIGI,
I did some research on travelers currently in the STP area.
My hope is to move/copy these into the new area SRFRD.
Please let me know what you think?
ACTION
TRAV_ID
WCA
COMP
ACTION
TRAV_AUTHOR
TRAV_REVISION
TRAV_TITLE
DONE
SRFRD-CHEM-CAV-BCP
CHEM
CAV
BCP
Ashley Mitchell
R1
This document captures the data generated from a Buffered Chemical Polish executed in the Closed Chemistry Cabinet.
DONE
SRFRD-D3
D3
M. McDonald
R3
This traveler is a report generated for any off normal activity or event.¿ This traveler is to be used to document events or processes that are not outlined in normal procedures or travelers.¿ For part inspections the NCR inspection report is to be used.
DONE
SRFRD-EBW-COMP
EBW
COMP
Adam O Brien
R1
Traveler captures Electron-Beam Welding parameters and processes for all EBW work
DONE
SRFRD-NCR
NCR
A. Mitchell
R13
This is a standard report that is used to document parts that do not meet specific criteria.
MAYBE
SRFTRNG-CHEM-COMP-DEGR
CHEM
COMP
DEGR
Ashley Mitchell
R1
SRF Training Components Preparation
MAYBE
ER5C-FAB-CAV
FAB
CAV
Gigi Ciovati
R1
This traveler records the steps to complete C75 cavity fabrication.
MAYBE
STP-CAV-PROC/ER5C-PROC-CAV
PROC
CAV
V. Bookwalter
R2
Generic SRF Institute Processing Traveler
MAYBE
STP-CAV-RFIN
TUNE
CAV
RIN
D. Forehand
R1
Generic Cavity RF Incoming Inspection Traveler
MOVE
ER5C-CHEM-CAV-DEGR/USC
CHEM
CAV
DEGR
A. Wildeson
R3
C75 Cavity Degrease
MOVE
ER5C-CHEM-CAV-HPR
CHEM
CAV
HPR
A. Wildeson
R3
C75 Cavity High Pressure Rinse
MOVE
STP-COMP-BRAZ
FURN
COMP
BRAZ
Naeem Huque
R3
Brazing Procedure Specification
MOVE
STP-CAV-VTRF
VTA
CAV
VTRF
K. Davis
R3
VTA RF Cavity Test
UNSURE
STP-CAV-CHEM-ACID
CHEM
CAV
ACID
A. (Anderson) Mitchell
R1
Acid Etching at the Chemical Fume Hood Traveler
UNSURE
ER5C-CHEM-CAV-CBP
CHEM
CAV
CBP
G. Ciovati
R2
Centrifugal Barrel Polishing of C75 cavities
UNSURE
ER5C-CHEM-CAV-FLAP
CHEM
CAV
FLAP
A. Wildeson
R2
C75 Cavity flange Final lapping traveler
UNSURE
SRFTRNG-CHEM-CAV-HEP
CHEM
CAV
HEP
Ashley Mitchell
R1
SRF training Cavity Horizontal Electropolish
UNSURE
ER5C-CHEM-CAV-THK
CHEM
CAV
THK
G. Ciovati
R4
C75 cavity thickness measurement
UNSURE
ER5C-CHEM-COMP-BCP
CHEM
COMP
BCP
G. Ciovati
R3
BCP weld-prep region of C75 Nb cavity components
UNSURE
STP-CAV-PROC-BAKE/CLNRM-CAV-BAKE
CLNRM
CAV
BAKE
D. Forehand
R1
STP Cavity Bake-out
UNSURE
STP-CAV-PROC-HEAT/FURN-CAV-HEAT
FURN
CAV
HEAT
D. Forehand
R1
STP Cavity Heat Treatment
UNSURE
STP-CAV-INSP-OPTI
INSP
CAV
OPTI
M. Stirbet
R1
Cavity optical inspection
UNSURE
STP-VTA-CCMAP
VTA
CCMAP
N Brock
R2
VTA Dewar Comp Coil Adjustment
UNSURE
STP-VTA-FMAP
VTA
FFMAP
P. Kushnick
R1
VTA Magnetic Field Mapping Traveler
DONE
ALREADY IN SRFRD
MAYBE
COPY FOR OTHER PROJECTS?
MOVE
MOVE FROM STP (MOST USED)
UNSURE
NOT SURE IF NEEDED IN SRFRD
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20250426/94d37906/attachment-0001.htm>
More information about the Pansophy
mailing list