[PEPPo] Weekly Status Meeting = OFF, Accelerator Seminar = ON
Joseph Grames
grames at jlab.org
Tue Aug 23 13:34:57 EDT 2011
Dear PEPPo Collaborator:
Our weekly status update meeting is cancelled.
In lieu of our meeting, I invite you to attend Wednesday's Accelerator
Seminar. Serkan will discuss options for a cw positron source concept
at CEBAF and the FEL. Please find details of the seminar below.
Also, I encourage your attendance at the PEPPo presentation to PAC38 on
Thursday at 9:00am in the CC Auditorium.
Best,
Joe
ACCELERATOR SEMINAR
"Beware the Lepton Sign Change: C.W. Positron Beam at JLab"
Speaker: Serkan Golge
There are more than a hundred small-scale and a few number of
large-scale positron facilities around the world. These facilities
mainly use radioisotope sources, nuclear reactions and linacsto obtain
positrons depending on the purpose and intensity requirements. At
Jefferson Lab, there are two injectors (CEBAF and FEL injectors), which
can provide 100% duty cycle, high quality and high energy electrons to
create positrons via pair production. For the CEBAF injector, the energy
will go up to 125 MeVwhen the 12 GeVupgrade is completed. The current
FEL energy achievement is up to 135 MeV. In this talk, I will be
presenting feasibility studies for a multi-purpose c.w. positron beam
utilizing either of these injectors. The feasibility study includes
optimization of the positron efficiency, and power deposition in the
target and surrounding elements, capture and transfer optics. For the
purpose of re-acceleration, 3 uAof positron current is achievable under
certain boundary conditions by using CEBAF injector. For low energy
applications 1013e+/s can be obtained by using FEL electron beam.
Wednesday, August 24, 2011
10:00 a.m.
CEBAF Center, F113
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/peppo/attachments/20110823/2860f00f/attachment.html
More information about the PEPPo
mailing list