[PEPPo] Daily RC Report 5/27
Joe Grames
grames at jlab.org
Sun May 27 20:56:43 EDT 2012
*Daily RC Report 5/27:*
Everyone on the commissioning program is making good progress. On last
SWING good step forward finding launch orbit to production target
required for effective collection and defining quadrupole settings to
transport beam to targets. Likewise, first annihilation coincidence
events w/ test e- beam. On last OWL excellent progress defining
operational parameters for the Compton detectors, measuring physics
asymmetry as a function of the Compton target polarization. On last DAY
production of very thorough look-up table to generate and setup beam
momenta from 3-8 MeV/c. Heading into this SWING setup of T=5MeV beam
with optics for nice round spot completed. Tests for reproducing orbits
on T1 at various momenta was held up for ~couple hours due to a video
switcher hardware failure, now corrected. We're back on commissioning
program...
*Noteworthy items:*
* After passing the 7.2MeV threshold RadCon performed survey of
Injector w/o problems. We continue to operate with rapid access
system.
* Use BURT to save setups/load setups
o know what you're downloading (global injector downloads are
unnecessary)
o state destination and beam momentum
* Communicate in P[MeV/c], E[MeV], T[MeV]
* We wills start making accesses more often - access checklists must
be performed
* Please start refining your procedures/links at the wiki How To
<https://positron.jlab.org/wiki/index.php/Shift_takers_how-to_procedures>
*Next 24 hours:*
SUMMARY Sunday, 5/27 - Owl Run Plan: SL=Suleiman
* Completed CD3 - Determine rate and LV for integrated method
* Completed CD5 - Study analyzing magnet magnetization vs. magnet
current
* Completed CD6 - Study asymmetry vs. PITA at AM=+/-60A
SUMMARY Sunday, 5/27 - Day Run Plan: SL=Poelker
* Completed - Setup/save cryounit settings (gradients/phase) crested
to beam on 2D spectrometer
* Completed - Define Mott energy setup (T=5.000MeV, E=5.511MeV,
5.487MeV/c)
* RadCon assessment @ 1530
3 pA PMT Asymmetry response to PITA scan
https://cebaf.jlab.org/elog/entry/1787912
Planned Sunday, 5/27 - Swing Run Plan: SL=Freyberger
* Setup
o Use Matt's setting for ~near P=5.487MeV/c
o Measure P, Setup to T1 (quads + center on S1)
* Measurements
o NEED ACCESS TO INSTALL TS1
o CB17 - Production current/targets (vacuum, radiation,
conditions)
o CD8 - Compton trigger assessment
Planned Monday, 5/28 - Owl Run Plan: SHIFT LEADER = Suleiman
* Program
o TS1 is required!
o Complete CD8 (Compton trigger assessment - background in
Compton) w/ e+ mode
o CD1 PQB setup
o CD2 Mott
Planned Monday, 5/28 - Day Run Plan: SHIFT LEADER = Poelker
* CB16: Characterize PEPPo w/ 3 different momenta:
o a) Setup centered on T1
o b) Vary spectrometer: map out position on collimators and
downstream viewers
o c) Set spectrometer to best central value
o d) Vary region 1 correctors H/V to map out beam acceptance
to last viewer/FC
o Would like to have dE and E running to also measure beam
energy of electrons
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/peppo/attachments/20120527/d44e5d99/attachment.html
More information about the PEPPo
mailing list