[PEPPo] Green beam lines, a challenging concept
Jay Benesch
benesch at jlab.org
Fri Nov 18 12:00:15 EST 2022
Eric,
My thought was positron collection or transport immediately following the solenoids but Sami is better placed than I to answer your question.
Jay
________________________________________
From: Eric Voutier <voutier at ijclab.in2p3.fr>
Sent: Friday, November 18, 2022 11:41 AM
To: Jay Benesch
Cc: peppo at jlab.org
Subject: [EXTERNAL] Re: [PEPPo] Green beam lines, a challenging concept
Hello Jay,
I can certainly try the when back in Orsay. For sake or arguing with them, what exactly do you have in mind : positron beam transport, or collection part at the target or ... ?
Eric
----- Mail original -----
De: "Jay Benesch via PEPPo" <peppo at jlab.org>
À: peppo at jlab.org
Envoyé: Vendredi 18 Novembre 2022 14:35:07
Objet: [PEPPo] Green beam lines, a challenging concept
This may have some application to positron collection. It would be interesting to get the pole shape or even the Opera model if Eric can arrange that. Including the Opera Optimizer parameters, since I have never successfully used it on harmonic content.
https://urldefense.proofpoint.com/v2/url?u=https-3A__arxiv.org_abs_2211.09611&d=DwIFaQ&c=CJqEzB1piLOyyvZjb8YUQw&r=SGaYNSADUPYXfK5QBgXfQmUYAPWtOHJVBy3dP3DEiTo&m=K9sO0m9ulUmdTD5_pTtaLY8YUk_rGNcVp9mMb_xLdJvMdLBrX2YtA5Qx9t7dDoCX&s=ingkpAMHtqXEaWiFTrMx3-Plt8fGQjETpbM6sf8VC1Q&e=
Green beam lines, a challenging concept
F. Osswald (DRS-IPHC), E. Traykov, T. Durand, M. Heine, J. Michaud, J. C. Thomas
Due to increasing environmental and economic constraints, optimization of ion beam transport and equipment design becomes essential. The future should be equipped with planet-friendly facilities, that is, solutions that reduce environmental impact and improve economic competitiveness. The tendency to increase the intensity of the current and the power of the beams obliges us and brings us to new challenges. Installations tend to have larger dimensions with increased areas, volumes, weights and costs. A new ion beam transport prototype was developed and used as a test bed to identify key issues to reduce beam losses and preserve transverse phase-space distributions with large acceptance conditions.
Subjects: Accelerator Physics (physics.acc-ph)
Cite as: arXiv:2211.09611 [physics.acc-ph]