From: "Steve Christo" <christo at jlab.org> 
To: "Eugene Pasyuk" <pasyuk at jlab.org> 
Cc: "Chao Peng" <pengc2010 at gmail.com>, "Bob Miller" <rmiller at jlab.org>, "prad" <prad at jlab.org> 
Sent: Friday, April 29, 2016 9:22:37 AM 
Subject: Re: [PRad] HyCal work 

Yes, it's pretty tight but slides ok. The only problem is that there is no support for the pipe inside the detector beyond the collimator so it is not possible to direct the beam pipe through without going off axis and possibly damaging the Tedlar joints. I'll look into it when I go to hall in a few minutes. 
Steve 

On 4/29/2016 8:39 AM, Eugene Pasyuk wrote: 



Thank you, Steve! 
I've been to the hall, it looks good. 
Since this is tight fit on the pipe we have to be careful when inserting the pipe into the tube. 

Guys, before we do anything els on the HyCal we need to check for the light leaks. 

-Eugene 



BQ_BEGIN
From: "Steve Christo" <christo at jlab.org> 
To: "Chao Peng" <pengc2010 at gmail.com> , "Eugene Pasyuk" <pasyuk at jlab.org> 
Cc: "Bob Miller" <rmiller at jlab.org> , "prad" <prad at jlab.org> 
Sent: Friday, April 29, 2016 6:27:41 AM 
Subject: Re: [PRad] HyCal work 




BQ_BEGIN

Thank you. I've installed the Tedlar tube through HyCal but had to keep the beam pipe inside the tube while the RTV cures. It shouldn't prevent you from installing the GEM detector frame. I'll check it and remove the beam pipe later this morning. 
Steve 

On 4/28/2016 8:12 PM, Chao Peng wrote: 

BQ_BEGIN

Hi Eugene, 

All power supplies are turned off. 
It is safe to access HyCal. 

Best, 
Chao 

On Thu, Apr 28, 2016 at 6:03 PM, Eugene Pasyuk < pasyuk at jlab.org > wrote: 

BQ_BEGIN

Ok. Send us a note when it is OFF. 

-Eugene 



BQ_BEGIN
From: "Chao Peng" < pengc2010 at gmail.com > 
To: "Eugene Pasyuk" < pasyuk at jlab.org > 
Cc: "prad" < prad at jlab.org >, "Steve Christo" < christo at jlab.org >, "Bob Miller" < rmiller at jlab.org > 
Sent: Thursday, April 28, 2016 5:55:21 PM 
Subject: Re: [PRad] HyCal work 

BQ_END


BQ_BEGIN

Hi Eugene, 
I am taking some data right now, and I will turn the HV off tonight. 

Best Regards, 
Chao 

On Thu, Apr 28, 2016 at 2:17 PM, Eugene Pasyuk < pasyuk at jlab.org > wrote: 

BQ_BEGIN

Tomorrow HyCal should be down and we can start working on it. The first thing to do would be to open beam holes upstream and downstream and install Tedlar tube through the HyCal. 

If anyone is taking data with HyCal today make sure to finish it and turn all HV off before tomorrow morning. The chiller also should be turned off. 

-Eugene 

_______________________________________________ 
PRad mailing list 
PRad at jlab.org 
https://mailman.jlab.org/mailman/listinfo/prad 


BQ_END




-- 
Chao Peng 
Department of Physics 
BOX 90305 
Duke University 
Durham, NC 27708 


BQ_END


BQ_END




-- 
Chao Peng 
Department of Physics 
BOX 90305 
Duke University 
Durham, NC 27708 

BQ_END


_______________________________________________ 
PRad mailing list 
PRad at jlab.org 
https://mailman.jlab.org/mailman/listinfo/prad 

BQ_END


BQ_END


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/prad/attachments/20160429/03b0a92c/attachment.html>


More information about the PRad mailing list