[PRad] draft presentation
gasparan at jlab.org
gasparan at jlab.org
Wed Mar 23 17:43:58 EDT 2016
Thanks Kondo, I got it.
Ashot
> Hi Ashot,
> Here is a pic taken by Xinzhan
>
> Kondo
> ________________________________________
> From: PRad [prad-bounces at jlab.org] on behalf of gasparan at jlab.org
> [gasparan at jlab.org]
> Sent: Wednesday, March 23, 2016 5:19 PM
> To: Eugene Pasyuk
> Cc: prad
> Subject: Re: [PRad] draft presentation
>
> 1) anybody please take a picture of the GEMs with scintillators
> from the side part and email it to me. Thanks.
> 2)agree, the vacuum window is on the Box already, will change it.
> 3) will refer to the document.
> 4)will do separate run plan.
>
> Ashot
>
>
>>
>> Add on slide 14 that the window with beam pipe attachment was
>> hydrostatically tested at 30 psi.
>> After that full assembly, the tank with the window, pumped down and
>> vacuum
>> leak checked. No leaks detected.
>> You also may refer to the window design and test document. I already
>> posted it on the wiki.
>>
>> You say:
>> "Vacuum Window is ready for installation
>> (estimated time: 2 days)"
>> This is outdated.
>>
>> The window is already installed on the tank. The tank with window will
>> go
>> to the Hall as one piece. Tank support cart is also assembled. So, we
>> will
>> crane the cart, and then crane the tank. Two lifts. The attache to the
>> target and to the downstream beam pipe.
>>
>> GEM photo on slide 9 is very poor quality. Can you find something
>> better?
>> You can say that GEM chambers are already mounted on the frame and this
>> assembly will go to the Hall as one piece to be mounted on HyCal.
>>
>> In addition to slides Make the Run Plan as a separate document, copy
>> from
>> Powerpoint to Word.
>> There is a placeholder for on it the wiki.
>>
>> -Eugene
>>
>> ----- Original Message -----
>>> From: "Eugene Pasyuk" <pasyuk at jlab.org>
>>> To: "Ashot Gasparian" <gasparan at jlab.org>
>>> Cc: "prad" <prad at jlab.org>
>>> Sent: Wednesday, March 23, 2016 4:36:11 PM
>>> Subject: Re: [PRad] draft presentation
>>
>>> Some comments on the Run Plan.
>>>
>>> We should keep HyCal on the transporter for the test run.
>>>
>>> 1. There is no "Beam block" position for the collimator. We should use
>>> FSD
>>> interlock with tagger magnet power supply.
>>>
>>> Drop 1(b,c,d,f) It is pointless because HyCal will not be in the beam.
>>>
>>> Cell alignment procedure 2(l,m,n) should be changed to utilize
>>> additional foils
>>> with quadrants.
>>>
>>> Add GEM trigger delay adjustment.
>>>
>>> -Eugene
>>>
>>> ----- Original Message -----
>>>> From: "Ashot Gasparian" <gasparan at jlab.org>
>>>> To: "prad" <prad at jlab.org>
>>>> Sent: Wednesday, March 23, 2016 4:09:15 PM
>>>> Subject: [PRad] draft presentation
>>>
>>>> Hi All,
>>>>
>>>> The draft of my presentation is attached. I am still working on the
>>>> formating
>>>> part so, please check the information and the numbers for now.
>>>>
>>>> Kondo, please check the "GEM Requirement" slides and let me know if
>>>> some
>>>> numbers need to be corrected.
>>>>
>>>> Thank you,
>>>> Ashot
>>>>
>>>> _______________________________________________
>>>> PRad mailing list
>>>> PRad at jlab.org
>>>> https://mailman.jlab.org/mailman/listinfo/prad
>>> _______________________________________________
>>> PRad mailing list
>>> PRad at jlab.org
>>> https://mailman.jlab.org/mailman/listinfo/prad
>>
>
>
> _______________________________________________
> PRad mailing list
> PRad at jlab.org
> https://mailman.jlab.org/mailman/listinfo/prad
>
More information about the PRad
mailing list