[PRad] the list of current tasks and a suggestion to set the veto counters
gasparan
gasparan at jlab.org
Fri Nov 22 10:45:53 EST 2024
Hi All,
I list below and in the attachment the current tasks together with my
suggestion how to
make an on-line positioning of the veto counters.
Please take a look and prepare your comments.
Thanks
Ashot
.......................................................................
1) Veto scintillators thickness: we are testing them now but, it will
take another week
if not more. I will contact Youri to see if this is important for
the engineering design
part.
2) Veto scintillator attachment tolerance: we are working on this item
but, it will need
again a week or so. I will contact Youri and Dipangkar to see if a 0.5
mm tolerance
is realistic (for both edges of a single scintillator). In all cases we
need survey points
on this device.
Weizhi, please make this item a priority before the weekend. If we need
one more meeting, I am ready for that.
3) Changing the vacuum windows from X17 to PRad-II experiments (as it
was shown by Bob). This is highly undesirable since it will involve not
only the vacuum part (that comes from the target change also) but it
will require a new survey of the HyCal. If we decide to run PRad-II with
the new (smaller) window, then the
Pb-glass part of the HyCal no longer in use (if even it is ready).
Weizhi and Chao, please take one more look on this part to before the
weekend.
4) The GEM efficiency high accuracy measurement using the so-called
third GEM. As we discussed on Monday, this item is not fully clear to
me. My questionwas, and still is, what is the accuracy of these
measurements using the GEM1, GEM2 and HyCal (plus the target vertex, we
even have 12C foil in the target cell)?
Nilanga, Weizhi, Chao, and who wants to contribute in this part, please
come up with your arguments on this part.
My approach is that if we even will end up needing the third GEM then
there are
several open item on this way: (a) the size of the third GEM; (b) we
still will need to attach and survey it better than 1 mm (better than
HyCal is providing it); (c) the electronics ...
5) Running the X17 experiment with E = 4.4 GeV. We need to recalculate
all resolutions and most importantly the parameter space plot for this
new energy before the end of January (well before our ERR meeting in
mid-February).
……………………………………………………………………………..
My suggestions for the Veto counters survey and geometrical calibration
1) First, we require +/- 0.5 mm engineering survey accuracies on all 4
edges of all 4 scintillators. We need to come up with a way to make
survey points on these scintillators with this accuracy.
2) Then, with electron beam on, target in, all devises (HyCal, …)
calibrated we make a so-called on-line veto counters geometrical
calibration.
a) Position the vito counter(s) well below (close to the beam) to fully
cover the
area of the second crystal(s) (counted from the beam hole). That can be
done with on-line measurements of the Moller events.
b) With the stepper motor(s) slowly moving the scintillators away from
the beam, continues measurement of the Moller coverage area(s) by the
reconstructed (on-line) Moller events.
c) Fix the veto positions when the count(s) of the Moller pairs with the
scintillator(s) and the edge of second scintillator(s) are just
vanishing.
3) This method needs a step size of 0.1 mm for our stepper motors. This
is a question to Youri and Christopher (Bob).
............................
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Current_Tasks_Nov_22_2024.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 17284 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/prad/attachments/20241122/aca04222/attachment.docx>
More information about the PRad
mailing list