[Prex] [New Logentry] RC report - Hall A status
chandan at jlab.org
chandan at jlab.org
Fri Aug 7 10:00:01 EDT 2020
Logentry Text:
--
Due to problems on the 1L07 HV unit and SL access issues (chain drop to restricted access multiple times) MCC was not able to deliver any beam to Hall A overnight.
Many RF people are working on the 1L07 HV unit problem. It may take a while to fix that.
The program deputy is optimistic to deliver high current beam to all halls by Monday.
There were some problems with the LHRS detector motion system.
Since the accelerator will be down for sometime, we have taken the hall to 'control access' for that work. The work for the motion system is done.
The main detectors are connected to the counting mode DAQ.
The sieve slits are inserted for both arms.
The HRS magnets are set for the CREX optics.
Some RHRS VDC repair work may happen if MCC doesn't need the hall to be locked up.
We will start low current commissioning as soon as the beam is available.
We will have our remote RC meeting at 3:30PM today:
Bluejeans link: https://bluejeans.com/256205934
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3821990
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/prex/attachments/20200807/980d4b41/attachment.html>
More information about the Prex
mailing list