Dear Collaborators,
The beam was restored today with the reduced energy of 11.17GeV. We
checked the radiation levels and performed a harp scan to evaluate the
beam convergence. However, many interruptions and position instabilities
prevented us from performing a collimator scan to optimize the
transmission so far.
The CDC HV was ramped up and we confirmed that the currents in the inner
rings stayed well below the threshold. The detector will be included in
the read-out and it will remain turned on for the rest of the weekend.
We plan to take mostly production data (200nA beam current, 10^-4 RL AL
radiator) until Monday morning. At 8.30am on Monday, the accelerator
group will start performing beam studies and we will have at least 4h
time for hall access.
Have a good weekend,
Alex