[Rgc] [New Logentry] RC summary Oct 19

hauenst at jlab.org hauenst at jlab.org
Wed Oct 19 14:55:01 EDT 2022


Logentry Text:
--
RC Summary October 19:

Yesterday, we were down due to repairs of Arc9. Chris took the time to perform a TE measurement on the NH3 target.
Beam came back around 8.30pm, harp scans looked good and by 9:30pm we were back in production mode with 1/2 plate OUT.
Target polarization reached -74% maximum.

We collected about 100M triggered events with 1/2 plate OUT. Some of the data seems to have MVT off for a while (see https://logbooks.jlab.org/entry/4063057).

During the DOE accelerator tour today, we took the time to change target to ND3, repair magnet beacons and exchanged broken CND CFD module (https://logbooks.jlab.org/entry/4063234, https://logbooks.jlab.org/entry/4063237, https://logbooks.jlab.org/entry/4063256).

We expect beam back late Day and early swing. We plan to do check beam on the tagger, do a  Moller run and then continue production on ND3

Best,
Florian







---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4063374
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/rgc/attachments/20221019/475fa748/attachment.html>


More information about the Rgc mailing list