Logentry Text:
--
Summary from Thursday-Day 9/29/2022 - Friday-Owl 9/30/2022

No beam (in general) during these time. There was a short time when we have beam at around 11 PM. After we sent the beam to the tagger and did quality check (harp scan), the beam them off until now (~10 am). 

Work during maintenance day:
- TE measurement by the Target group: https://logbooks.jlab.org/entry/4048772
- Installed CH2 target: https://logbooks.jlab.org/entry/4048695
- Vacuum pump installation
- CND work: https://logbooks.jlab.org/entry/4048530
- Improvement RICH Recovery: https://logbooks.jlab.org/entry/4048570
- CND calibration: https://logbooks.jlab.org/entry/4048637
- CTOF calibration: https://logbooks.jlab.org/entry/4048555
- DAQ work 

Some issue during the maintenance day:
- Humidity increase in SVT during the target work: https://logbooks.jlab.org/entry/4048725
- Anomaly on the fridge post target change: https://logbooks.jlab.org/entry/4048769

Plan: Do the beam-quality check (send the beam do tagger and harp scan before Faraday Cup and production run), taking the data on CH2 for at least 24 hours. Collected 200 M events then flip the HW plate to Out then collecting more events on CH2.

We will have meeting today at 2.00 PM.

Zulkaida


 

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4048928
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/rgc/attachments/20220930/97a63272/attachment.html>


More information about the Rgc mailing list