[Sbs] [New Logentry] RC update -Nov 20th

chandan at jlab.org chandan at jlab.org
Mon Nov 20 09:20:03 EST 2023


Logentry Text:
--
At the 8 am MCC meeting, it was mentioned that the work for emptying the sump would take another 4-6 hours.
If the work gets completed successfully, hall A will get beam authorization sometime in the swing. 
The main pump for the hall A dump has been running since Friday after the recovery from a trip - most likely caused by some air bubbles in the line.

Bill Henry is working on the target - turning on the LASERs. He will turn on the magnets too.
The day shift TO is on shift.
All the subsystem owners are requested to turn on their detector's HVs and make sure things are working as expected.
The SL for the Day and Swing shifts are on Standby mode.


There are many opening slots (due to extension) on the shift schedule. Please consider for signing up for shifts.
https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=SBS-GEn-2022#href20231116

We will have the regular RC meeting at 3:30 pm today.
https://jlab-org.zoomgov.com/j/1616220064
Meeting ID: 161 622 0064
Passcode: 314159

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4223237
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/sbs/attachments/20231120/75da30d2/attachment-0001.html>


More information about the Sbs mailing list