[Sbs] [New Logentry] RC Update - Nov 21
chandan at jlab.org
chandan at jlab.org
Tue Nov 21 09:45:02 EST 2023
Logentry Text:
--
<br>
<br>
Here are some notable things/issues that have happened since yesterday:
<br>
<br>
<ul>
<li>The work of emptying the sump was completed around yesterday at 19:40 hour. Thanks to all the people who worked hard to bring Beam back into hall A- <a href
="https://logbooks.jlab.org/entry/4223464"> Emptying sump </a> </li>
<li>Received Beam authorization at 20:30 - <a href
="https://logbooks.jlab.org/entry/4223499"> Beam authorization </a> </li>
<li>Complited harp scans and beam spot looked good - <a href="https://logbooks.jlab.org/entry/4223605"> Beam spot size </a> </li>
<li> Beam was down for some time due to a violation of operation restriction (unrastered CW beam on LD2 target of Hall C). Fortunately, they quickly resolved this and MCC started beam operation - <a href ="https://logbooks.jlab.org/entry/4223643"> Restored beam operation </a> </li>
<li> Ion chamber calibration on the Carbon hole target -<a href ="https://logbooks.jlab.org/entry/4223682"> Ion chamber calibration </a> </li>
<li> Around 3 am, there was a DAQ problem due to SBS GEMROC22. Eric and Alex resolved it.- <a href ="https://logbooks.jlab.org/entry/4223733"> DAQ problem </a> </li>
<li> Raster BRM issue needs to be looked at- <a href ="https://logbooks.jlab.org/entry/4223788"> Raster BRM issue </a> </li>
<li> Updated BPM XSOF and YSOF for the new target - <a href="https://logbooks.jlab.org/entry/4223908"> New Position locks </a> </li>
<li> Final beam position analysis from Bill - <a href="https://logbooks.jlab.org/entry/4223943"> Thanks Owl crew and Bill </a> </li>
<li> Performed ion chamber calibration for the reference cell and multifoil targets. </li>
<li> GEM experts will perform the GEM HV scan. After that, we will take one hour of production before going for Moller polarization measurement. </li>
<li> Don Jones prefers Moller measurement to start before 2 pm or after 8 pm. </li>
</ul>
<br>
Here are the two shift summaries from <a href="https://logbooks.jlab.org/entry/4223515"> yesterday's swing </a> and <a href="https://logbooks.jlab.org/entry/4223872"> today's owl </a>.
<br>
Thanks to all the people who signed up for the shifts on short notice.
<br>
There are still a couple of open slots. Please consider signing up for those open slots.
<br>
<a href="https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=SBS-GEn-2022"> Shift Sign-up page </a>
<br>
We will have a regular RC meeting at 3:30 pm today in the CH conference room.
<br>
People can join remotely via:
<be>
<a href="https://jlab-org.zoomgov.com/j/1616220064"> Zoom link </a>
<br>
Meeting ID: 161 622 0064
<br>
Passcode: 314159
<br/>
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4224026
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/sbs/attachments/20231121/2832fb31/attachment.html>
More information about the Sbs
mailing list