Hi All,
See the update from John Galambos.  The auxiliary valve stems mentioned are the cooldown valve stems.  An issue with galling after many cycles was identified and being addressed.
Cheers,
Ed
________________________________
From: Galambos, John D. <galambosjd at ornl.gov>
Sent: Friday, October 21, 2022 10:05 AM
To: Andersen, Ken <andersenkh at ornl.gov>
Cc: Ed Daly <edaly at jlab.org>; Cain, Wendy <cainwa at ornl.gov>
Subject: [EXTERNAL] PPU Weekly update




From: Galambos, John D. <galambosjd at ornl.gov>
Date: Thursday, October 20, 2022 at 3:33 PM
To: Galambos, John D. <galambosjd at ornl.gov>
Subject: Weekly update

The PPU project controls team has been processing several change control requests this week. In the Superconducting RF area, w some auxiliary valve stems on the 2 installed cryomodules are being replaced prior to cooldown next week. In the RF area we replaced a defective installed klystron and the RF equipment needed to power the new cryomodules is now controllable from the control room. The new high voltage convertor module is undergoing a high power run this week. In the Ring area the first chicane magnet measurements continued at FNAL and tooling is progressing for the new dump septum magnet. Additional klystron gallery installation is proceeding with wave guide and circulator installation for the equipment needed to support the phase 2 power ramp-up next spring.







John Galambos

Proton Power Upgrade Project  Director

Mobile: 865-228-1531 office: 865-576-5482






-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/sns_ppu_group/attachments/20221021/2cbd79f7/attachment.html>


More information about the Sns_ppu_group mailing list