[Testlablcwusers] LCW System Calibrations
Adam Cutler
cutler at jlab.org
Tue Nov 18 09:34:48 EST 2025
Good Morning,
We (Facilities) would like to perform the annual calibration on the controls for the TL LCW system. While controls are being calibrated, system DP control will be placed into manual, as well as system temperature and conductivity will deviate from normal. With DP control in manual, if a flow path is isolated or open, pressure will deviate from normal. Conductivity and temperature will be lower than normal setpoints as control valves are stroked across their full operating range. Calibrations in years past have been completed during one day shift, is there a day (days) that users can support so this task can be coordinated with the subcontractor?
Thanks.
R/
Adam C.
Mechanical Engineer
757-861-5599
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/testlablcwusers/attachments/20251118/51296f68/attachment.htm>
More information about the Testlablcwusers
mailing list