[Testlablcwusers] LCW System Calibrations
Eric Sun
qsun at jlab.org
Tue Nov 18 14:10:20 EST 2025
Hi Adam,
We may energize MOLELR TM4 from Dec 4 to Dec 12. Any other days should be fine with us. But please let me know once the day is chosen to perform LCW maintenance.
Thanks
Eric
________________________________
From: Testlablcwusers <testlablcwusers-bounces at jlab.org> on behalf of Adam Cutler <cutler at jlab.org>
Sent: Tuesday, November 18, 2025 9:34 AM
To: testlablcwusers at jlab.org <testlablcwusers at jlab.org>
Subject: [Testlablcwusers] LCW System Calibrations
Good Morning,
We (Facilities) would like to perform the annual calibration on the controls for the TL LCW system. While controls are being calibrated, system DP control will be placed into manual, as well as system temperature and conductivity will deviate from normal. With DP control in manual, if a flow path is isolated or open, pressure will deviate from normal. Conductivity and temperature will be lower than normal setpoints as control valves are stroked across their full operating range. Calibrations in years past have been completed during one day shift, is there a day (days) that users can support so this task can be coordinated with the subcontractor?
Thanks.
R/
Adam C.
Mechanical Engineer
757-861-5599
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/testlablcwusers/attachments/20251118/f3872340/attachment-0001.htm>
More information about the Testlablcwusers
mailing list