[Tgun] [New Logentry] Plan 8-2-19
fhannon at jlab.org
fhannon at jlab.org
Fri Aug 2 10:00:03 EDT 2019
Logentry Text:
--
Status:
HV power supply has no remote control
Floating ground for Bias supply not complete
Plan:
Fay to contact Spellman to try and resolve the issue
Riad: test the supply at low kV in local mode with the HV cable removed. Make safety aware of this test.
Riad: pursue short term solution of longer HV cable and moving supply upstairs (assuming local works)
Mamun: set up heat tape around the gun vacuum chamber and prepare (but not start yet) a 150kV bake.
Mark: prepare the grid bias supply with modified connector for processing purposes. This way we can have the cathode hot during processing so as to not poison it.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3713570
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/tgun/attachments/20190802/e80ff65d/attachment.html>
More information about the Tgun
mailing list