[BTeam] A/LASO CEBAF status and schedule
Arne Freyberger
freyberg at jlab.org
Mon May 5 13:57:31 EDT 2014
????????????????????
REMAINING SCHEDULE
Arne Freyberger
????????????????????
1 Supplemental LASO :OPS:
???????????????????
1.1 Update 1:
?????????????
Significant progress over the weekend. 5.5pass CEBAF is a reality.
Scaling to 950MeV/linac started on Saturday. Some self-immolation on
Saturday, scaling the corners not the best thing to do. By Sunday
afternoon, ORFP of the 950MeV/linac was proceeding smoothly. Beam to
6R, ORFP complete to 5R. Then the wall, multiple hardware issues took
CEBAF offline for about 12h.
Today, at present, the Hall-D PSS certifications are underway. It is
hoped that the ORFP of the 950MeV/linac configuration can get back on
track on Swing/Owl tonight.
Notable items:
? start with the "corners" on design and tweak from there. If corners
are not on design when beam first traverses an arc, put them there.
? Use CMPQ to verify dipoles are at or near design
? Pathlength, dispersion, courant snyder
1.2 Schedule
????????????
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
Day Name Date Owl Owl-Sup Day Day-Sup Swing Swing-Sup Comment
4am-noon noon-8pm 8pm-4am
(Duck Hunter) (Country Club) (Night Club)
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
Monday Cinco de Mayo Benson Ahmad Tiefenback Owl: Downhard
Benesch Day shift: PSS certs/authorization
Swing shift: 10GeV to 5C!!
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
Tuesday May-06 Krafft Benesch Douglas Owl: 10GeV to 5C
Freyberger Satogata Day/Swing: 10GeV to Tagger dump?
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
Wednesday May-07 Tiefenback Stutzman Bogacz Restore 550? or Optics at 950?
Freyberger Roblin Satogata
(if needed)
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
Thursday May-08 Krafft Kazimi Satogata Opics
Roblin
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
Friday May-09 Grames Wang INJ/NL locked up until noon
Hofler
?????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue Cell: (757) 876-6289
Postal Suite 19 Email: freyberg at jlab.org
Newport News, VA 23606
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20140505/0f323f8a/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gcibehic.png
Type: image/png
Size: 92634 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20140505/0f323f8a/attachment-0002.png>
More information about the BTeam
mailing list