[BTeam] It is Supplemental LASO time again!
Arne Freyberger
freyberg at jlab.org
Fri May 2 16:55:48 EDT 2014
schedule update.... I'll post in control room please mark it up if you
wish to see any changes.
1 Supplemental LASO :OPS:
===================
----------------------------------------------------------------------------------------------------------------------------------------------------
Day Name Date Owl Owl-Sup Day Day-Sup Swing Swing-Sup Comment
4am-noon noon-8pm 8pm-4am
(Duck Hunter) (Country Club) (Night Club)
----------------------------------------------------------------------------------------------------------------------------------------------------
Friday May-02 Morozov Terzic Wang Beam tuned to
Spata 4/5R, CHL-1 trip
----------------------------------------------------------------------------------------------------------------------------------------------------
Saturday May-03 Morozov Benesch Grames Beam to 5C dumplet,finish 550MeV/linac
Freyberger Tiefenback start scaling to 910MeV/linac
----------------------------------------------------------------------------------------------------------------------------------------------------
Sunday May-04 Suleiman Roblin Freyberger 910MeV/linac ORFP
Kazimi
----------------------------------------------------------------------------------------------------------------------------------------------------
Monday Cinco de Mayo Benson Ahmad Tiefenback document 10GeV to 5C
Benesch Day shift: PSS certs/authorization
Swing shift: plow beam into tagger dump
----------------------------------------------------------------------------------------------------------------------------------------------------
Tuesday May-06 Krafft Benesch Douglas Restore 550MeV/linac, start
Satogata Optics program
----------------------------------------------------------------------------------------------------------------------------------------------------
Wednesday May-07 Grames Stutzman Bogacz
(switch with Freyberger Roblin Satogata
Tiefenback)
----------------------------------------------------------------------------------------------------------------------------------------------------
Thursday May-08 Krafft Kazimi Satogata
Roblin
----------------------------------------------------------------------------------------------------------------------------------------------------
Friday May-09 Tiefenback Beam off 8am??
(switch
with Grames)
----------------------------------------------------------------------------------------------------------------------------------------------------
On 05/02/2014 04:08 PM, Arne Freyberger wrote:
> Colleagues,
> In order to maintain momentum at this critical time in the
> commissioning, the concept of a supplemental LASO is being re-instated
> with the tentative schedule below. A twist in the Supplement-LASO is
> that the SLASO shifts are offset by 4h from the nominal shifts. This
> is done to provide seem-less continuity during this intense period.
> The schedule has not been completely filled out and if you wish to
> volunteer for a SLASO shift, please let me know. As some of you
> who have been assigned a SLASO shift are hearing about it the first
> time, I expect there will be some horse trading. In addition to the
> schedule below, there is a chart of the progress since the ZA
> affair. Progress is on schedule, but due to the recent down times
> (CHL1 trips, dumplet issues) there is no room left for inefficient
> operation.
>
> Arne and Mike
> 1 Supplemental LASO :OPS:
> ===================
>
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Day Name Date Owl Owl-Sup Day Day-Sup Swing Swing-Sup Comment
> 4am-noon noon-8pm 8pm-4am
> (Duck Hunter) (Country Club) (Night Club)
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Friday May-02 Morozov Terzic Wang Beam tuned to
> Spata 4/5R, CHL-1 trip
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Saturday May-03 Morozov Benesch Grames Beam to 5C dumplet,finish 550MeV/linac
> Freyberger Tiefenback start scaling to 910MeV/linac
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Sunday May-04 Suleiman Roblin Freyberger 910MeV/linac ORFP
>
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Monday Cinco de Mayo Benson Ahmad Tiefenback document 10GeV to 5C
> Satogata Day shift: PSS certs/authorization
> Swing shift: plow beam into tagger dump
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Tuesday May-06 Krafft Benesch Douglas Restore 550MeV/linac, start
> Freyberger Optics program
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Wednesday May-07 Grames Stutzman Bogacz
>
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Thursday May-08 Krafft Kazimi Satogata
>
> --------------------------------------------------------------------------------------------------------------------------------------------------
> Friday May-09 Tiefenback Wang Zhang
>
> --------------------------------------------------------------------------------------------------------------------------------------------------
> --
> Arne Freyberger
> Director of Accelerator Operations
> Jefferson Lab
> 12000 Jefferson Avenue Cell: (757) 876-6289
> Postal Suite 19 Email:freyberg at jlab.org
> Newport News, VA 23606
>
>
> _______________________________________________
> BTeam mailing list
> BTeam at jlab.org
> https://mailman.jlab.org/mailman/listinfo/bteam
--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue Cell: (757) 876-6289
Postal Suite 19 Email: freyberg at jlab.org
Newport News, VA 23606
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20140502/da441a06/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/png
Size: 82514 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20140502/da441a06/attachment-0002.png>
More information about the BTeam
mailing list