In order to maintain momentum at this critical time in the
commissioning, the concept of a supplemental LASO is being re-instated
with the tentative schedule below. A twist in the Supplement-LASO is
that the SLASO shifts are offset by 4h from the nominal shifts. This is
done to provide seem-less continuity during this intense period. The
schedule has not been completely filled out and if you wish to volunteer
for a SLASO shift, please let me know. As some of you who have been
assigned a SLASO shift are hearing about it the first time, I expect
there will be some horse trading. In addition to the schedule below,
there is a chart of the progress since the ZA affair. Progress is on
schedule, but due to the recent down times (CHL1 trips, dumplet issues)
there is no room left for inefficient operation.
Arne and Mike
1 Supplemental LASO :OPS:
===================
--------------------------------------------------------------------------------------------------------------------------------------------------
Day Name Date Owl Owl-Sup Day Day-Sup Swing Swing-Sup Comment
4am-noon noon-8pm 8pm-4am
(Duck Hunter) (Country Club) (Night Club)
--------------------------------------------------------------------------------------------------------------------------------------------------
Friday May-02 Morozov Terzic Wang Beam tuned to
Spata 4/5R, CHL-1 trip
--------------------------------------------------------------------------------------------------------------------------------------------------
Saturday May-03 Morozov Benesch Grames Beam to 5C dumplet,finish 550MeV/linac
Freyberger Tiefenback start scaling to 910MeV/linac
--------------------------------------------------------------------------------------------------------------------------------------------------
Sunday May-04 Suleiman Roblin Freyberger 910MeV/linac ORFP
--------------------------------------------------------------------------------------------------------------------------------------------------
Monday Cinco de Mayo Benson Ahmad Tiefenback document 10GeV to 5C
Satogata Day shift: PSS certs/authorization
Swing shift: plow beam into tagger dump
--------------------------------------------------------------------------------------------------------------------------------------------------
Tuesday May-06 Krafft Benesch Douglas Restore 550MeV/linac, start
Freyberger Optics program
--------------------------------------------------------------------------------------------------------------------------------------------------
Wednesday May-07 Grames Stutzman Bogacz
--------------------------------------------------------------------------------------------------------------------------------------------------
Thursday May-08 Krafft Kazimi Satogata
--------------------------------------------------------------------------------------------------------------------------------------------------
Friday May-09 Tiefenback Wang Zhang
--------------------------------------------------------------------------------------------------------------------------------------------------
--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue Cell: (757) 876-6289
Postal Suite 19 Email: freyberg at jlab.org
Newport News, VA 23606
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20140502/8fb26182/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: fegfiedf.png
Type: image/png
Size: 82514 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20140502/8fb26182/attachment-0002.png>
More information about the BTeam
mailing list