For consideration at today's B-Team planning meeting:
An entry (~4 hours) is needed to ready the Large Dynamic Range Diagnostic Station for a follow on beam test.
It is hoped that time can be allocated for this work early in the May 4-May 15 day running period for both the installation and the beam test.
The ATLis tasks are:
Install LDRDS (Large Dynamic Range Diagnostic Station)
and
5D new diagnostic station beam test