[BTeam] Evening Update: Back in business

Arne Freyberger freyberg at jlab.org
Wed Feb 18 17:33:48 EST 2015


  * CEBAF is back in business.
  * Tune mode beam has been transported to the BSY dump.
  * Issues preventing CW beam transport.
  * Gun/Inj group are working on the front end trying to identify the
    source of the tail
  * Beam studies tomorrow.....Long day.


  Spring 2015 Startup Evolution


    1 Spring 2015 StartUp OPS


      1.1 Spreadsheet

  * Run Spread Sheet
    <https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>

  * Please send me your gmail address if you wish to have edit privileges


      1.2 |[1/5]| Maintenance Tasks

  * |[ ]| Align INJ Sync. Light Monitor (Thursday Morning)
  * |[ ]| Verify Yao cavity electronics in tunnel (Thursday Morning?)
  * |[ ]| West Arc Power Loop configuration (4h)
  * |[ ]| Resurrect 1L05
  * |[X]| MARC6++ Water Flow–Acid Flush
  * |[ ]| RSEP9A Acid flush


      1.3 2015-02-18 Wed

 1. |[0/3]| Swing
      * |[ ]| Injector setup re-visited (4h?)
          o |[ ]| Gun Group
          o |[ ]| Inj Group
      * |[ ]| Optimize Inj. bunching/phasing(0L04)
          o Kazimi/Wang/Hofler
      * |[ ]| CW 1-pass to BSY Dump, 2nd attempt.
      * ORFP to 5C dumplet


      1.4 2015-02-19 Thu

 1. |[0/1]| Owl
      * ORFP to 5C dumplet
 2. |[0/8]| Day
      * |[ ]| RSEP9A Acid flush
      * |[ ]| Acquire 2E ε and TWISS data
      * |[ ]| Access into North Linac
          o |[ ]| Inj. Sync Light alignment (Freeman)
          o |[ ]| YAO cavity electronics check (Freyberger)
      * |[ ]| Auto quad commissioning (Joyce)
      * |[ ]| Pathlength Calculator Upgrade Com. (Joyce)
      * |[ ]| Mya Save/Restore Commissioning (CJS)
      * |[ ]| Auto steer commissioning (Joyce)
      * |[ ]| Bunch length measurement via Arc1 SLM
          o If beam is CW capable
          o Ahmad Mahoud
          o Tief
 3. |[0/6]| Swing
      * |[ ]| load 1E and 2E match
      * |[ ]| beam back to 2R
      * |[ ]| beam to 3R,4R
      * |[ ]| ORFP
      * |[ ]| ARC[1..3] M56 = 0
      * |[ ]| beam to 5R,6R
      * |[ ]| ORFP
      * |[ ]| ARC[4..5] M56 = 0

Author: Arne Freyberger

Created: 2015-02-18 Wed 17:27

Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org 
<http://orgmode.org> mode 8.0-pre)

Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>


-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue      Cell: (757) 876-6289
Postal Suite 19             Email:  freyberg at jlab.org
Newport News, VA 23606

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150218/19835d71/attachment-0002.html>


More information about the BTeam mailing list