Dear CALCOM,
After a significant number of hurdles we finally have some semblance of the “complete” timelines for RGA Sp18. What we ended up doing was plotting every other run in some places and every third run in others for the 10 GeV (which have a very large number of total runs). I would appreciate if subsystem experts could have a cursory look at their timelines and let me know their general thoughts. In particular, a loose estimate of how much effort they would expect to be required in order to calibrate their subsystems. Significantly more than Fa18 or a comparable amount? No need to pick out runs to calibrate or anything like that, just a first look. Remember to make use of the inbending and outbending filters at the top as the 10 GeV timeline includes both polarities and they aren’t in continuous chunks. Finally, as this is the first complete timeline we’ll probably be removing several runs from the list of those that planned to be calibrated (I already see a few trigger tests etc) so don’t worry about the runs with super special conditions.
3-pass timeline<https://clas12mon.jlab.org/rga/pass2/sp18/pass0/sp18_v0.04_6GeV/tlsummary/>
5-pass timeline<https://clas12mon.jlab.org/rga/pass2/sp18/pass0/sp18_v0.04_10GeV/tlsummary/>
Best regards,
Timothy
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/clas12_calcom/attachments/20231113/e77861f1/attachment.html>
More information about the Clas12_calcom
mailing list