> On 5 Dec 2019, at 12:21, Daria Sokhan <daria at jlab.org> wrote:
>
> Hi Silvia,
>
> I asked Zhiwen to cook a couple of runs for calibration because FTOF needed it -- there will be adjustments to its settings as a result. This wasn't production yet.
>
> Cheers,
> Daria
>
>
>
> On Thursday, 5 December 2019, <silvia at jlab.org> wrote:
> > Hi Zhiwen,
> > just to inform you, last week we found a bug in the reconstruction of the
> > CVT path length for the CND, so we have asked to Raffaella and Veronique
> > to have a new tagged version of coatjava that we can use for RGB
> > calibrations and cooking. It will also include the CD veto for charged
> > particles.
> > So be prepared to soon switch to that. With the current version it makes
> > no sense to attempt to calibrate the CND, as it will have the wrong path
> > length and will need to be redone anyway.
> >
> > Also, we had come up with a plan for the calibration of the spring run, as
> > far as sequence of runs and subsystems to be calibrated. I think we should
> > adopt the same for the fall run, to minimize iterations. I understand that
> > for now the main point is only monitoring to check detectors performances,
> > so I am ok with whatever cookings you're doing :-)
> >
> > The plan we had for the spring data was:
> > Cook 6156 (first good production run) to make FTOF and DC calib filter
> > →calibrate
> > Recook 10 files/run for the RF calibration
> > Once RF is calibrated, another 10 files/run pass to make monitors and
> > timelines
> > Establish the runs that need timing recalibration using timelines
> > Cook and filter these runs and calibrate (FTOF first, then recook and do
> > ECAL, CTOF, CND, BAND)
> >
> > So I think we should adopt the same plan once the real production data
> > taking has started for the current run Ipick the first good production run
> > and make FTOF and DC calib first...).
> >
> > Best regards and thanks a lot to both!
> > Silvia
> >
> >
> > _______________________________________________
> > Clas12_rgb mailing list
> > Clas12_rgb at jlab.org
> > https://mailman.jlab.org/mailman/listinfo/clas12_rgb
> >
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/clas12_rgb/attachments/20191205/43c26bca/attachment.html>
More information about the Clas12_rgb
mailing list