[Dsg-ft] FT location in EEL 125

Amanda Hoebel amandah at jlab.org
Mon Aug 8 11:17:10 EDT 2016


Dear Marco,

We have seen a video that Walt Akers made regarding the arrangement of EEL-125 for the SVT, MicroMegas, and RICH access to the EEL-124 clean room. The video can be found via this link: https://www.youtube.com/watch?v=W9-A36wYoIE

If we could make the back roll-up door accessible, the RICH could be moved and assembled independently of the SVT and MicroMegas. In order to make the back roll-up door accessible, we were wondering if the Forward Tagger could be moved to a different area of EEL-125, possibly where the HPS equipment is stored. Would it be possible to move both the HPS equipment and the Forward Tagger? Thanks in advance.

Sincerely, 
Amanda




More information about the Dsg-ft mailing list