[Dsg-ft] [Dsg-internal] FT location in EEL 125
Amrit Yegneswaran
yeg at jlab.org
Mon Aug 8 11:33:28 EDT 2016
since we do not know when the FT will be moved to the hall, keeping the
FT in the corner would, i guess, provides in addition to the access to
the rear door, a secluded area where one can test the system
undisturbed, till it is moved to the hall.
On 8/8/2016 11:17 AM, Amanda Hoebel wrote:
> Dear Marco,
>
> We have seen a video that Walt Akers made regarding the arrangement of EEL-125 for the SVT, MicroMegas, and RICH access to the EEL-124 clean room. The video can be found via this link: https://www.youtube.com/watch?v=W9-A36wYoIE
>
> If we could make the back roll-up door accessible, the RICH could be moved and assembled independently of the SVT and MicroMegas. In order to make the back roll-up door accessible, we were wondering if the Forward Tagger could be moved to a different area of EEL-125, possibly where the HPS equipment is stored. Would it be possible to move both the HPS equipment and the Forward Tagger? Thanks in advance.
>
> Sincerely,
> Amanda
>
>
> _______________________________________________
> Dsg-ft mailing list
> Dsg-ft at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-ft
> _______________________________________________
> Dsg-internal mailing list
> Dsg-internal at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-internal
More information about the Dsg-ft
mailing list