Dear Amrit and Amanda,
we watched Walt's video and as far as we understood, the FT area is not 
affected by the current plan. Are you sure that using the back door will 
be possible? it would mean to keep free  the present FT area and all the 
space in front of it (where RICH cabinets would be located, according to 
the video).
According to the existing schedule we are moving the FT to the Hall in 
November. If it is confirmed we will free the area well in time for the 
beginning of RICH assembly. If the FT move will be delayed, we can think 
of moving the FT and related equipment to the right side of the room in 
October-November when we will have people onsite from FT team (Genova, 
Saclay Edinburgh) since the move implies recabling everything. By the 
way, this would also imply to (re)move all the cabinets, dark box and 
other equpment currently present on the right side of the room that does 
not belong to us (Stepan?)
Let us know waht you think.
Cheers
Marco and Raffaella



Amrit Yegneswaran wrote:
> since we do not know when the FT will be moved to the hall, keeping 
> the FT in the corner would, i guess, provides in addition to the 
> access to the rear door,  a secluded area where one can test the 
> system undisturbed, till it is moved to the hall.
>
>
> On 8/8/2016 11:17 AM, Amanda Hoebel wrote:
>> Dear Marco,
>>
>> We have seen a video that Walt Akers made regarding the arrangement 
>> of EEL-125 for the SVT, MicroMegas, and RICH access to the EEL-124 
>> clean room. The video can be found via this link: 
>> https://www.youtube.com/watch?v=W9-A36wYoIE
>>
>> If we could make the back roll-up door accessible, the RICH could be 
>> moved and assembled independently of the SVT and MicroMegas. In order 
>> to make the back roll-up door accessible, we were wondering if the 
>> Forward Tagger could be moved to a different area of EEL-125, 
>> possibly where the HPS equipment is stored. Would it be possible to 
>> move both the HPS equipment and the Forward Tagger? Thanks in advance.
>>
>> Sincerely,
>> Amanda
>>
>>
>> _______________________________________________
>> Dsg-ft mailing list
>> Dsg-ft at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/dsg-ft
>> _______________________________________________
>> Dsg-internal mailing list
>> Dsg-internal at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/dsg-internal
>
>
> _______________________________________________
> Dsg-ft mailing list
> Dsg-ft at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-ft




More information about the Dsg-ft mailing list