[Dsg-htcc] gas controls modification
    nick markov 
    markov at jlab.org
       
    Fri Jan 13 13:43:35 EST 2017
    
    
  
Hi,
I’ve talk to Bob today. He is positive we will have power in the hall and not sure about ethernet.
Temporary  location of the HTCC in the Hall is not determined yet, as well as Tuesday schedule.
I will let you know s soon as anything clears up.
Nick.
> On Jan 13, 2017, at 1:16 PM, Brian Eng <beng at jlab.org> wrote:
> 
> Marc modified the flow control to only allow a number between 1-20 LPM (inclusive) to be set as the flow.
> The program was also modified to make sure the current flow will be the starting flow if the program is ever restarted (which was tested and verified to work).
> 
> We still need to test to see if the setup will work with only the local/private network enabled; worst case we have to change the network configuration based on where/what is connected.
> 
> However, that will be done next week; so we're done with the cRIO if you guys want to do any testing.
> 
>> On Jan 13, 2017, at 10:33 AM, Marc McMullen <mcmullen at jlab.org> wrote:
>> 
>> Hi Nick,
>> 
>> I went over and the sensor output looks fine. Any idea of the schedule for Tuesday, I'll need to make some changes to code and test.
>> 
>> Marc McMullen
> 
> _______________________________________________
> Dsg-htcc mailing list
> Dsg-htcc at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-htcc
    
    
More information about the Dsg-htcc
mailing list