[Dsg-rich] EEL 124 layout for RICH assembly, DCs moving?

Tyler Lemon tlemon at jlab.org
Wed Oct 26 08:33:39 EDT 2016


Dear Walt, 

Since the clean room layout where RICH is rotated 90 degrees would be best for the assembly, that should be considered the final layout for how EEL 124 will be set up for RICH assembly. 

Also, it seems that only one R3 drift chamber has been moved out of the clean room and put in Hall B. The RICH assembly structure and detector frame are expected to arrive at JLab in November. Is there a contingency plan for the clean room layout if R3 DCs do not leave by November? Could they be moved to the shower curtain room or to where other DC regions were previously stored? 

Best regards, 
Tyler 

From: "Mirazita Marco" <Marco.Mirazita at lnf.infn.it> 
To: "Walt Akers / JLAB" <akers at jlab.org> 
Cc: "Patrizia Rossi" <rossi at jlab.org>, "clas12 rich" <clas12_rich at jlab.org>, "dsg-rich" <dsg-rich at jlab.org> 
Sent: Wednesday, October 26, 2016 4:28:24 AM 
Subject: Re: [Clas12_rich] EEL 124 layout for RICH assembly 

Dear Walt, 
thank you for the information, we will check with our space 
requirements. 
Marco 


Il 2016-10-25 19:15 Walt Akers / JLAB ha scritto: 
> Here you go Marco... 
> 
> As you can see from the sketch, the overall size of the vestibule and 
> air lock are similar to what was shown in the earlier drawings. The 
> most notable issue is the presence of the electrical breaker panel 
> and fire extinguisher at the rear of the room. The safety keep out 
> area 
> for those will have to be observed in your planning. 
> 
> Walt 
> 
> Marco Mirazita wrote: 
>> Dear Walt, 
>> the DSG informed us that, because of the current location of the SVT, 
>> the layout of the RICH assembly in the EEL-124 has been changed as in 
>> the attached file EEL124-rich_sept2016.jpeg. 
>> While it is in principle fine for us to move the RICH close to the 
>> gowning and air shower rooms, the RICH should be rotated by 90 
>> degrees, as in the file EEL124_Preliminary Layout 13-10-2106.jpg. 
>> In addition, we would check the available space around the RICH in 
>> order to be sure that the gantry crane could be operated properly. 
>> However, we don't have the dimension of the gowning and air shower 
>> rooms. Could you provide us this information? 
>> Thank you, 
>> Marco 
>> 
_______________________________________________ 
Clas12_rich mailing list 
Clas12_rich at jlab.org 
https://mailman.jlab.org/mailman/listinfo/clas12_rich 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20161026/6a7178e6/attachment-0002.html>


More information about the Dsg-rich mailing list