[Dsg-rich] test assembly of RICH stiffeneing tool complete
Patrizia Rossi
rossi at jlab.org
Mon Aug 21 16:22:28 EDT 2017
Thank you all for the work and also the pictures!
patrizia
---------------------------------------------------
# Patrizia Rossi
# Jefferson Lab
# 12000 Jefferson Avenue
# Suite 5
# Newport News VA 23606 (USA)
# e-mail: rossi at jlab.org
# phone: +1 (757) 269 7740
# fax: + 1 (757) 269 5800
# cell: +1 (757) 528 7606
> On 21/ago/2017, at 15:59, Tyler Lemon <tlemon at jlab.org> wrote:
>
> Hello,
>
> Attached are more pictures from today's assembly of the RICH stiffening tool.
>
> Best regards,
> Tyler
>
> From: "Tyler Lemon" <tlemon at jlab.org <mailto:tlemon at jlab.org>>
> To: "dsg-rich" <dsg-rich at jlab.org <mailto:dsg-rich at jlab.org>>, "Ed Folts" <folts at jlab.org <mailto:folts at jlab.org>>
> Sent: Monday, August 21, 2017 2:12:53 PM
> Subject: test assembly of RICH stiffeneing tool complete
>
> Hello,
>
> As Amrit mentioned, we have assembled and attached the stiffening tool to RICH. Thank you again to everyone that helped. Attached is a photo of the stiffening tool fastened to RICH.
>
> During the stiffening tool's assembly, we found that we did not have enough hardware for the full assembly. We will need to procure more 1/2-inch washers and we will also need to confirm the bolt lengths for each screw hole for the final assembly.
>
> As Dario mentioned, we did have trouble tightening the bolts at the front of the stiffening tool at RICH's nose, but we were able to find tools to allow us to tighten these bolts.
>
> At the complex angle at the side of the stiffening tool, one screw hole location on each side did not accommodate the specified length bolt because the angle of the part caused the bolt to hit the stiffening tool. This would be fixed by verifying the bolt lengths.
>
> After the weight of the stiffening tool was placed fully on RICH's shell, we noted that the clearance on the left (side towards cleanroom's gowning area) between the stiffening tool and RICH and the clearance on the right (side towards SVT) between stiffening tool and RICH did not match. The left side had a clearance of 25 mm and the right a clearance of 45 mm. We believe that these differences in clearance between RICH's shell and the stiffening tool can be corrected once all correct hardware is installed.
>
> Despite the hardware issues we were able to successfully align all screw holes. We also put the weight of the stiffening tool fully on the detector shell with no issues. The stiffening tool has been left in place on RICH for now. We will buy more washers for the stiffening tool's final assembly.
>
> Best regards,
> Tyler
>
> <Brian Eng and Ed Folts lowering RICH stiffening tool onto detector shell 2017-08-21.jpg><Brian Eng and Tyler Lemon installing lateral arm of stiffening tool.jpg><DSG installing lateral arms of stiffening tool.jpg><DSG moving gantry into place to fit RICH stiffening tool to detector shell 2017-08-21.jpg><Fulley assembled stiffening tool in place on RICH detector shell.jpg><Marc McMullen, Brian Eng, Amrit Yegneswaran, and DSG aligning anchoring bolts on RICH stiffening tool and detector shell.jpg><Mindy Leffel and Ed Folts using gantry to lift stiffening tool 2017-08-21.jpg><Pablo Campero, Brian Eng, and Tyler Lemon assembling RICH stiffening tool.jpg>_______________________________________________
> Dsg-rich mailing list
> Dsg-rich at jlab.org <mailto:Dsg-rich at jlab.org>
> https://mailman.jlab.org/mailman/listinfo/dsg-rich <https://mailman.jlab.org/mailman/listinfo/dsg-rich>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20170821/c7593cf9/attachment-0002.html>
More information about the Dsg-rich
mailing list