[Dsg-rich] EEL124 floor marked for RICH anchoring drilling
Tyler Lemon
tlemon at jlab.org
Wed Feb 15 15:55:59 EST 2017
Hello Calvin, Bob, and Doug,
The floor of EEL124 clean room has been marked for where the RICH assembly structure anchoring should be done. Holes to be drilled are indicated by solid, blue or black circles with two perpendicular, blue lines pointing to the circle.
The Hilti anchors and threaded rods needed for the anchoring are on top of the wooden RICH Box 2 in EEL 125.
Could the holes be drilled tomorrow? Please let us know.