[Dsg-rich] RICH assembly structure anchor drilling complete
Patrizia Rossi
rossi at jlab.org
Thu Feb 16 12:41:44 EST 2017
Thank to everybody for this work!
patrizia
---------------------------------------------------
# Patrizia Rossi
# Jefferson Lab
# 12000 Jefferson Avenue
# Suite 5
# Newport News VA 23606 (USA)
# e-mail: rossi at jlab.org
# phone: +1 (757) 269 7740
# fax: + 1 (757) 269 5800
# cell: +1 (757) 528 7606
> On 16/feb/2017, at 11:50, Tyler Lemon <tlemon at jlab.org> wrote:
>
> Hello,
>
> The anchor holes for RICH assembly structure have been drilled. Thank you to Calvin Mealer, Todd Ewing, and Sahin Arslan for their help drilling the holes. The threaded rods, leveling nuts, and locking nuts have also been put in place to anchor the assembly structure base plates.
>
> While drilling the sixteenth and final hole, they hit rebar in the floor. At Amrit's advice, they trimmed ~0.25 inch off of the Hilti anchor so it lies flush with the clean room floor. By Amrit's calculation, this will not compromise the strength of the anchor.
>
> Attached are pictures showing the completed drilling template with anchoring bolts, a close-up of one assembly structure base plate with threaded rods, and Sahin tightening nuts to secure the base plate to the anchor.
>
> Best regards,
> Tyler
> <RICH drilling template base plate with anchoring 2017-02-16.jpg><RICH drilling template with anchoring bolts 2017-02-16.jpg><Sahin Arslan tightening nut on RICH assembly base plate anchor 2017-02-16.jpg>_______________________________________________
> Dsg-rich mailing list
> Dsg-rich at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-rich
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20170216/4fe94de7/attachment-0002.html>
More information about the Dsg-rich
mailing list