[Dsg-rich] Timeline for construction of RICH assembly structure and detector shell

Marco Mirazita Marco.Mirazita at lnf.infn.it
Thu Jan 26 07:40:21 EST 2017


Hi Tyler,
just a couple of things. It could be that we will be able to start 
working already on the 6th, but we will give a confirmation as soon as 
we arrange our trips.
Concerning the load test, am I right that the test will be done with 
1.25 times about 1000 kg of total RICH weight, i.e. about 1250 kg?
Thank you
Marco


Il 2017-01-25 21:34 Tyler Lemon ha scritto:
> Hello,
> 
> Attached is a proposed timeline for the tasks regarding the
> construction of the RICH assembly structure and detector shell.
> 
> Best regards,
> 
> Tyler
> 