[Dsg-rich] RICH N2 Supply Corrective Actions
Bob Miller
rmiller at jlab.org
Tue Jun 11 15:32:14 EDT 2019
All,
The following corrective actions will be taken to ensure the RICH N2
supply is not interrupted:
1. The N2 supply valve is now locked open and has a lock out tag on it
as shown in the pictures below
2. Replacement back up bottles have been ordered by Tyler
3. When the replacement bottles have been installed, I will move the
supply valve to the RICH gas panel
4. An alarm has been set up at 20 psi N2 supply pressure that will
notify the engineering on call person
5. An alarm will be set up at 10 psi for the back up bottles to know if
they are ready to supply the RICH. This alarm will also notify the
engineering on call person.
Regards,
Bob
--
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 822-9586
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-rich/attachments/20190611/e23c6c4d/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: lijhliefgmllnefl.jpg
Type: image/jpeg
Size: 440510 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-rich/attachments/20190611/e23c6c4d/attachment-0002.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: ijcfmoiepkdajndp.jpg
Type: image/jpeg
Size: 363155 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-rich/attachments/20190611/e23c6c4d/attachment-0003.jpg>
More information about the Dsg-rich
mailing list