[dsg-hallb_rich] RICH-II cooling and nitrogen supply in EEL
Bob Miller
rmiller at jlab.org
Wed Aug 4 11:33:22 EDT 2021
Hi Tyler,
That is correct, I will design the gas system upgrades and work with the
DSG for the monitoring.
I don't have any details yet. I will start on this in September to be
ready for use in the clean room in January.
Regards,
Bob
On 8/4/2021 11:26 AM, Tyler Lemon wrote:
> Hi Bob,
>
> In this morning's meeting with Hall B and RICH collaborators, you said
> Hall B will be taking care of the design and that you would start
> working on it more in September after the next physics run has started.
>
> You also mentioned that DSG would only need to provide the monitoring
> for it.
>
> Do you have any preliminary instrumentation selections made?
>
> We're finalizing what we need for the hardware interlocks and part of
> that is the gas system monitoring. We would need to know the quantity
> and type of each instrumentation, whether the instrument has a voltage
> or current readout, and the range of the instruments' readout.
>
> If we can get this info sooner rather than later, we can be sure to
> have the hardware interlock system ready for when they need it in the EEL.
>
> -Tyler
>
--
Bob Miller
Hall B Lead Engineer
Jefferson Lab
757 822-9586
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20210804/ad37af03/attachment.html>
More information about the dsg-hallb_rich
mailing list