[dsg-hallb_rich] RICH II assembly OSP
Marc Mcmullen
mcmullen at jlab.org
Mon Jan 24 10:48:30 EST 2022
Thanks Ed
Regards,
Marc McMullen
Sr. Instrumentation Designer
Detector Support Group
(757) 269-7738
From: Ed Folts<mailto:folts at jlab.org>
Sent: Monday, January 24, 2022 10:47 AM
To: Marc Mcmullen<mailto:mcmullen at jlab.org>; Patrizia Rossi<mailto:rossi at jlab.org>; Bert Manzlak<mailto:manzlak at jlab.org>; Stepan Stepanyan<mailto:stepanya at jlab.org>
Cc: dsg-hallb_rich at jlab.org<mailto:dsg-hallb_rich at jlab.org>; Cynthia (Thia) Keppel<mailto:keppel at jlab.org>; Ed Folts<mailto:folts at jlab.org>
Subject: RE: RICH II assembly OSP
Hi Marc
This was a very well done OSP.
Thanks
Ed
From: Marc Mcmullen <mcmullen at jlab.org>
Sent: Monday, January 24, 2022 10:18 AM
To: Patrizia Rossi <rossi at jlab.org>; Ed Folts <folts at jlab.org>; Bert Manzlak <manzlak at jlab.org>; Stepan Stepanyan <stepanya at jlab.org>
Cc: dsg-hallb_rich at jlab.org; Cynthia (Thia) Keppel <keppel at jlab.org>
Subject: RICH II assembly OSP
Good Morning Patrizia,
The RICH II assembly OSP<https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=122990> has been reviewed by the SMEs and is ready for final approval at the DSO, EHS&Q, and Hall B levels.
Final approval is need by either you or Ed for the DSO, Bert can sign for ESH&Q, and Stepan can sign for Hall B (also you or Thia could sign for Hall B as well).
Once signed I will have it printed and posted at the clean room.
Thanks for your attention in this matter,
Marc McMullen
Sr. Instrumentation Designer
Detector Support Group
(757) 269-7738
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20220124/1f771d4e/attachment.html>
More information about the dsg-hallb_rich
mailing list